| MANDATORY DISCLOSURE | | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| INSTITUTION DETAILS: BASIC DETAILS | | | | | | | | | |
| Current Application Number | 1-44643066039 | Application Type | Extension-Expansion-Closure | | | | | | | | | |
| Current Status | Submitted | Sub Status | Payment Received | | | | | | | | | |
| Permanent Institution ID | 1-5878861 | Academic Year | 2025-2026 | | | | | | | | | |
| ApprovalStatusof Application | Data Not Available | Application Opened Date | 12/3/2024 | | | | | | | | | |
| Application Submitted Date | 12/9/2024 | AttendScrutiny Committee Date | Data Not Available | | | | | | | | | |
| Appeal Requested Date | Data Not Available | ApplicationReopened Date | Data Not Available | | | | | | | | | |
| Overall Deficiency | No | | | | | | | | | |
| | | | | | | | | | | | |
| INSTITUTION DETAILS: MORE INFORMATION | | | | | | | | | |
| Name of Institution | Maria CollegeOfEngineeringAnd Technology | Address of Institution | AttoorPuliyamooduJunction Thiruvattar P.O | | | | | | | | | |
| State/ UT | Tamil Nadu | District | Kanyakumari | | | | | | | | | |
| Town/ City/ Village | Attoor | AICTE Region | Southern | | | | | | | | | |
| PIN | 629177 | Women's Institution | No | | | | | | | | | |
| Institution Type | Private-Self Financing | AnySelf-Financed Course ? | | | | | | | | | | |
| Yes | | | | | | | | | |
| PercentageGrantReceived from Government | 0 | AreyouanInstitutionfor PWD Students | No | | | | | | | | | |
| WhetherInstitutionisNAAC Accredited ? | N | NAAC CGPA | Data Not Available | | | | | | | | | |
| Letter Grade | Data Not Available | NAAC Status | Data Not Available | | | | | | | | | |
| Minority Institution | Yes | TypeofMinority Institution | Religious | | | | | | | | | |
| Minority Name, if Linguistic | Christian | Name of the Minority | CHRISTIAN | | | | | | | | | |
| MinorityCertificateIssued Date | 5/29/2015 | MinorityCertificateValid Till | 5/28/2020 | | | | | | | | | |
| Year of Establishment | 2008 | MandatoryDisclosure Link | www.mariacollege.org | | | | | | | | | |
| Yearof1stApprovalfrom AICTE | 2008 | ApplyforODL/Online New Institute? | Data Not Available | | | | | | | | | |
| AISHE Prefix | C | AISHE Numeric Code | C27028 | | | | | | | | | |
| AISHE Code | C-C27028 | WhetherInstitutionis Graded Autonomy ? | Data Not Available | | | | | | | | | |
| NBA Accreditation Points | 0 | NBA Points Valid Till | Data Not Available | | | | | | | | | |
| University | Data Not Available | WhetheryourUniversity has been recognized as anInstituteofEminence by MOE? | Data Not Available | | | | | | | | | |
| IstheLandSharedwith other Institute? | N | IsyourInstitutionnewly Approvedlastyear(LoA) & failed to Admit Students? | N | | | | | | | | | |
| Whether EWS reservation is implemented? | No | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| TRUST/ SOCIETY/ COMPANY | | | | | | | | | |
| NameoftheTrust/Society/ Company | AveMariaEducationalAnd Cahritable Trust | Type of the Trust/ Society/ Company | Trust | | | | | | | | | |
| Registered With | Registrar Office, Nagercoil | Registration Date | 7/16/2007 | | | | | | | | | |
| Registration Number | 247/07 | Trust/Society/Company Address | Panara Vilai Kannankarai VeeyanoorP.O. | | | | | | | | | |
| State/UT | Tamil Nadu | District | Kanyakumari | | | | | | | | | |
| Town / City / Village | Attoor | PIN | 629177 | | | | | | | | | |
| Land Phone STD Code | 4651 | Land Phone Number | 282352 | | | | | | | | | |
| PAN | AACTA0426G | GSTN No | Data Not Available | | | | | | | | | |
| Mobile Number | 9442520352 | Email Address | grusselraj@gmail.com | | | | | | | | | |
| Trust/Society/Company Website | www.maria-college-of-engineering.org | | | | | | | | | |
| | | | | | | | | | | | |
| TRUST/ SOCIETY/ COMPANY DETAILS | | | | | | |
| Sr.No | Name | Designation | Trustee Since | Trustee Till | Mobile Number | Email | | | | | | |
| 1 | Russel Raj | Chairman | 7/13/2007 | 12/13/2015 | 9443150352 | | | | | | | |
| 2 | Shiny | Member | 7/13/2007 | 12/13/2015 | | | | | | | | |
| 3 | Peter | Member | 7/13/2007 | 12/13/2015 | | | | | | | | |
| 4 | Mary | Member | 7/13/2007 | 12/13/2015 | | | | | | | | |
| 5 | Milton | Member | 7/13/2007 | 12/13/2015 | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Data not entered by Institution | | | | | | | | | | | | |
| | | | | | | | | | | | |
| QUESTIONS | | | | | | | | | | | |
| Do you wish to Apply for 'Extension of Approval (EOA)'? | Yes | | | | | | | | | | | |
| Doyouwishtoapplyforanychange(s)aspertheprovisionsofthisyearApprovalProcess Handbook? | Yes | | | | | | | | | | | |
| Do you wish to Apply for Extension Of Approval for 3 years? | No | | | | | | | | | | | |
| Do you wish to Apply for Introduction of Off-Campus ? | No | | | | | | | | | | | |
| DoyouwishtoApplyforIncreaseofIntakeinExistingCourse/NewCourse(Including Vocational/Dual/Integrated/Regional Language)? | Yes | | | | | | | | | | | |
| Do you wish to Apply for Reduction in Intake of Existing Course/Closure of the Course? | No | | | | | | | | | | | |
| Do you wish to Apply for Introduction of NRI? | No | | | | | | | | | | | |
| Do you wish to Apply for Introduction of OCI Program? | No | | | | | | | | | | | |
| Merger of Courses | No | | | | | | | | | | | |
| Conversion of Diploma Level into Degree Level and vice-versa | No | | | | | | | | | | | |
| Do you wish to Start New Program / Level in the Existing Institution? | No | | | | | | | | | | | |
| Do you wish to Apply for Change in the Name of the Course(s)? | Yes | | | | | | | | | | | |
| Do you wish to Apply for Merger of Institution operating in the same Campus or City? | No | | | | | | | | | | | |
| Do you wish to Apply for Change in the Name of the Institution? | No | | | | | | | | | | | |
| Do you wish to Apply for Change of Site/ Location? | No | | | | | | | | | | | |
| Do you wish to Apply for Conversion of Women's Institution into Co-ed Institution? | No | | | | | | | | | | | |
| Do you wish to Apply for Conversion of Co-ed Institution into Women's Institution? | No | | | | | | | | | | | |
| Do you wish to Apply for Change in the Name of the Affiliating University/Board? | No | | | | | | | | | | | |
| Do you wish to Apply for Change in the Name of the Trust/ Society/ Company? | No | | | | | | | | | | | |
| Do you want to change minority status of the institution? | No | | | | | | | | | | | |
| Do you wish to Apply for Twinning & Collaboration Program? | No | | | | | | | | | | | |
| Whether your Institution has converted into Deemed to be/State Private University? | No | | | | | | | | | | | |
| Do you wish to Apply for Working Professional? | No | | | | | | | | | | | |
| Do you wish to Apply for Restoration of Intake? | No | | | | | | | | | | | |
| Do you Intend to Apply for the option of Distance Learning/Online Learning? | No | | | | | | | | | | | |
| Doyou wish to Apply for Break in EOA through Hibernation? | No | | | | | | | | | | | |
| | | | | | | | | | | | |
| CONTACT PERSON\REGISTRAR DETAILS | | | | | | | | | |
| Title: | Dr. | First Name: | Russel | | | | | | | | | |
| Last Name: | G | Address: | Veeyanoor | | | | | | | | | |
| Designation: | Chairman | State/ UT: | Tamil Nadu | | | | | | | | | |
| District: | Kanyakumari | Town/ City/ Village: | Thiruvattaru | | | | | | | | | |
| Postal Code: | 629177 | STD Code: | 4651 | | | | | | | | | |
| Landline Number: | 283522 | Mobile Number: | 9842646190 | | | | | | | | | |
| AlternateMobile Number: | 9443150352 | Email Address: | grusselraj@gmail.com | | | | | | | | | |
| AlternateEmail Address: | maria.college.of.engineering@gmail.com | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Data not entered by Institution | | | | | | | | | | | | |
| | | | | | | | | | | | |
| REPRESENTATIVE DETAILS FOR SC/EVC/SAC/SHC | | | | | | | | |
| Active Representative | Name | Designation | Email Id | Mobile Number | | | | | | | | |
| Y | DR. Y.SUJAR | Principal | pplmaria@yahoo.com | 9442520352 | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| PROGRAMS | | | | | | | | | | |
| Programme | New/ Existing Programme | Year of Start | | | | | | | | | | |
| ENGINEERINGAND TECHNOLOGY | Existing Programme | 2008 | | | | | | | | | | |
| MANAGEMENT | Existing Programme | 2009 | | | | | | | | | | |
| COMPUTER APPLICATIONS | Existing Programme | 2023 | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Programme | Engineering &Technology |
| Sr. | Course Name | Level | Affiliatingbody/University | Intakeapproved2023-24 | IntakeApproved2024-25 | AppliedFor | Appliedintake2025-26 | NumberofRequiredFaculty | NumberofFaculty | NRI | OCI/FN | StatusofNBA |
| No. | ApprovalStatus | Approval | accreditation |
| | Status | |
| 1 | STRUCTURALENGINEERING | PG | AnnaUniversity,Chennai | 24 | 24 | EoA Only | 24 | 4 | 4 | Notinterested | Notinterested | Not Applicable |
| 2 | THERMALENGINEERING | PG | AnnaUniversity,Chennai | 24 | 24 | EoA Only | 24 | 4 | 4 | Notinterested | Notinterested | Not Applicable |
| 3 | CIVILENGINEERING | UG | AnnaUniversity,Chennai | 60 | 60 | EoA Only | 60 | 12 | 14 | Notinterested | Notinterested | Not Applicable |
| 4 | MECHANICALENGINEERING | UG | AnnaUniversity,Chennai | 120 | 120 | EoA Only | 120 | 24 | 26 | Notinterested | Notinterested | Not Applicable |
| 5 | COMPUTERSCIENCEANDENGINEERING | UG | AnnaUniversity,Chennai | 60 | 60 | EoA Only | 60 | 12 | 14 | Notinterested | Notinterested | Not Applicable |
| 6 | ELECTRICALANDELECTRONICSENGINEERING | UG | AnnaUniversity,Chennai | 30 | 30 | EoA Only | 30 | 6 | 7 | Notinterested | Notinterested | Not Applicable |
| 7 | ELECTRONICSANDCOMMUNICATIONSENGINEERING | UG | AnnaUniversity,Chennai | 30 | 30 | EoA Only | 30 | 6 | 8 | Notinterested | Notinterested | Not Applicable |
| 8 | POWERSYSTEMSENGINEERING | PG | AnnaUniversity,Chennai | 18 | 18 | EoA Only | 18 | 3 | 4 | Notinterested | Notinterested | Not Applicable |
| 9 | EMBEDDEDSYSTEMS | PG | AnnaUniversity,Chennai | 24 | 24 | EoA Only | 24 | 4 | 4 | Notinterested | Notinterested | Not Applicable |
| | | | | | | | | | | | |
| TECHNOLOGIES | | | | | | | | | | | |
| 10 | COMPUTERSCIENCE&ENGINEERING | PG | AnnaUniversity,Chennai | 24 | 24 | EoA Only | 24 | 4 | 4 | Notinterested | Notinterested | Not Applicable |
| 11 | AUTOMOBILEENGINEERING | UG | AnnaUniversity,Chennai | 30 | 30 | EoA Only | 30 | 6 | 8 | Notinterested | Notinterested | Not Applicable |
| 12 | COMMUNICATIONSYSTEMS | PG | AnnaUniversity,Chennai | 24 | 24 | EoA Only | 24 | 4 | 4 | Notinterested | Notinterested | Not Applicable |
| 13 | POWERELECTRONICSANDDRIVES | PG | AnnaUniversity,Chennai | 24 | 24 | EoA Only | 24 | 4 | 4 | Notinterested | Notinterested | Not Applicable |
| 14 | ARTIFICIALINTELLIGENCEANDDATASCIENCE | UG | AnnaUniversity,Chennai | 0 | 0 | Applicationfornewcourse | 60 | 3 | 3 | Notinterested | Notinterested | Not Eligible |
| 15 | ARTIFICIALINTELLIGENCEANDMACHINELEARNING | UG | AnnaUniversity,Chennai | 0 | 0 | Applicationfornewcourse | 30 | 2 | 2 | Notinterested | Notinterested | Not Eligible |
| 16 | INFORMATIONTECHNOLOGY | UG | AnnaUniversity,Chennai | 0 | 0 | Applicationfornewcourse | 30 | 2 | 2 | Notinterested | Notinterested | Not Eligible |
| 17 | ARTIFICIALINTELLIGENCEANDDATASCIENCE | PG | AnnaUniversity,Chennai | 0 | 0 | Applicationfornewcourse | 24 | 2 | 2 | Notinterested | Notinterested | Not Eligible |
| 18 | CIVILENGINEERING(CONSTRUCTIONENGINEERINGANDMANAGEMENT) | PG | AnnaUniversity,Chennai | 0 | 0 | Applicationfornewcourse | 24 | 2 | 2 | Notinterested | Notinterested | Not Eligible |
| | | | | | | | | | | | |
| Programme | MANAGEMENT |
| Sr. | Course Name | Level | Affiliatingbody/University | Intakeapproved2023-24 | IntakeApproved2024-25 | AppliedFor | Appliedintake2025-26 | NumberofRequiredFaculty | NumberofFaculty | NRI | OCI/FN | StatusofNBA |
| No. | ApprovalStatus | Approval | accreditation |
| | Status | |
| 1 | MBA | PG | AnnaUniversity,Chennai | 180 | 180 | EoA Only | 180 | 18 | 22 | Notinterested | Notinterested | Not Applicable |
| | | | | | | | | | | | |
| Programme | COMPUTER APPLICATIONS |
| Sr. | Course Name | Level | Affiliatingbody/University | Intakeapproved2023-24 | IntakeApproved2024-25 | AppliedFor | Appliedintake2025-26 | NumberofRequiredFaculty | NumberofFaculty | NRI | OCI/FN | StatusofNBA |
| No. | ApprovalStatus | Approval | accreditation |
| | Status | |
| 1 | MCA | PG | AnnaUniversity,Chennai | 60 | 60 | EoA Only | 60 | 6 | 7 | Notinterested | Notinterested | Not Eligible |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Course Name | Level | Affiliatingbody/University | Intakeapproved2023-24 | IntakeApproved2024-25 | AppliedFor | Appliedintake2025-26 | NumberofRequiredFaculty | NumberofFaculty | NRI | OCI/FN | StatusofNBA |
| No. | ApprovalStatus | Approval | accreditation |
| | Status | |
| 1 | MBA | PG | AnnaUniversity,Chennai | 180 | 180 | EoA Only | 180 | 18 | 22 | Notinterested | Notinterested | Not Applicable |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| LAND DETAILS | | | | | | | | | |
| Location: | Rural | Land in Hilly Area: | No | | | | | | | | | |
| Total Area in Acres: | 10.5 | FSI: | Data Not Available | | | | | | | | | |
| Build Up Area (Sqm): | 24570 | Number of Pieces: | 1 | | | | | | | | | |
| LandPieceArea1in Acres: | 10.5 | LandPieceArea2in Acres: | Data Not Available | | | | | | | | | |
| LandPieceArea3in Acres: | Data Not Available | Maxdistanceinfarthest land pieces (Km): | Data Not Available | | | | | | | | | |
| Land registered with: | Registrar Office, Eraniel | Date of Registration: | 2/25/2008 | | | | | | | | | |
| Landusecertificate issued by: | TASHILDAR, KALKULAM | Landusecertificate issued Date: | 2/26/2008 | | | | | | | | | |
| Ownership Details: | Gift Deed | Is the Land Mortgaged: | No | | | | | | | | | |
| Mortgaged Purpose: | N | | | | | | | | | |
| Latitude (North/South): | North | Latitude Degree: | 8 | | | | | | | | | |
| Latitude Minute: | 20 | Latitude Second: | 2 | | | | | | | | | |
| Longitude (East/West) | East | Longitude Degree: | 77 | | | | | | | | | |
| Longitude Minute: | 17 | Longitude Second: | 6 | | | | | | | | | |
| Area of the Land earmarked for the proposed Institution | Data Not Available | | | | | | | | | |
| Whether High Tension line is passing through the Site of the institution(s) | No | | | | | | | | | |
| WhetheranyRiver/Canals/RailTracks/Highways/oranyothersuchentitypassing through the Site of the institution(s) | No | | | | | | | | | |
| Do you have any Additional Land Allocated for Merger or New Program? | Data Not Available | | | | | | | | | |
| Total Land (in acres) after Merger or adding New Program | Data Not Available | | | | | | | | | |
| Whether your Institution is going to use Off Campus after Merger? | No | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Land Registration Number: | 766/808 | Date of Registration: | 2/25/2008 | | | | | | | | |
| No. | | | | | | | | |
| 1 | Area of Land(acres): | 3.07 | Khasra Number: | 150 | | | | | | | | |
| PlotNumber/Survey Number: | 150/3J,150/1, 154/2B, | Land Situated At: | ATTOORTOWN PANCHAYAT | | | | | | | | |
| 3A,5A, 6, 162/2, | | | | | | | | |
| 3D,149/1B | | | | | | | | |
| LandRegisteredintheName of: | AveMariaEducational And Charitable Trust | Ownership or Government Lease: | Ownership | | | | | | | | |
| Land use Certificate Issued | Yes | LandUseCertificateIssuing Authority: | Tahsildar, Thiruvattar | | | | | | | | |
| Permitted for use of [permission should be only for Educational /Institutional] | Yes | | | | | | | | |
| | | | | | | | | | | | |
| BUILDING DETAILS | | | | | | | | | |
| Building Status: | Available | Total built up Area (ready) Sqm: | 24570 | | | | | | | | | |
| Activitiesinthebuildingotherthan courses approved by AICTE: | NIL | WhetherAccess,Circulation&Toilet Area are maintained as per NBC Norms?: | Yes | | | | | | | | | |
| TotalCarpetArea(sqm)- Instructional-Ready: | 13262 | TotalCarpetArea(sqm) Administrative-ready: | 1325 | | | | | | | | | |
| AccessandCirculationArea (Sqm): | 3299 | Total built up Area(sqm) Planned: | 24570 | | | | | | | | | |
| TotalCarpetArea(sqm)-Amenities- ready: | 6684 | Private Lease Building ? | No | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Building Name: | A | Building Approval Number: | 1569/2011TVLR | | | | | | | | |
| No. | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| 1 | SanctionedBuiltUp Area(sqm): | 3681 | Constructed Built Up Area: | 3681 | | | | | | | | |
| ApprovedCarpetArea- Instructional: | 1030 | ConstructedCarpetArea- Instructional: | 1030 | | | | | | | | |
| ApprovedCarpetArea- Administrative: | 542 | ConstructedCarpetArea- Administrative: | 542 | | | | | | | | |
| ApprovedCarpetArea- Amenities: | 1188 | Constructed Carpet Area- Amenities: | 1188 | | | | | | | | |
| Total Area Approved: | 3681 | Total Area Constructed: | 3681 | | | | | | | | |
| ActivitiesConductedinthe Building: | INSTRUCTIONAL, ADMINISTRATIVE | Non AICTE Approved courses running in the Building (if any): | NO | | | | | | | | |
| BuildingPlanApproving Authority: | Dtcp, Tirunelveli | Building Plan Approval Date: | 6/16/2011 | | | | | | | | |
| Sr. | Building Name: | B | Building Approval Number: | 1569/2011TVLR | | | | | | | | |
| No. | | | | | | | | |
| 2 | SanctionedBuiltUp Area(sqm): | 2031 | Constructed Built Up Area: | 2031 | | | | | | | | |
| ApprovedCarpetArea- Instructional: | 1020 | ConstructedCarpetArea- Instructional: | 1020 | | | | | | | | |
| ApprovedCarpetArea- Administrative: | 70 | ConstructedCarpetArea- Administrative: | 70 | | | | | | | | |
| ApprovedCarpetArea- Amenities: | 120 | Constructed Carpet Area- Amenities: | 120 | | | | | | | | |
| Total Area Approved: | 2031 | Total Area Constructed: | 2031 | | | | | | | | |
| ActivitiesConductedinthe Building: | INSTRUCTIONAL, AMENITIES | Non AICTE Approved courses running in the Building (if any): | NO | | | | | | | | |
| BuildingPlanApproving Authority: | Dtcp, Tirunelveli | Building Plan Approval Date: | 6/16/2011 | | | | | | | | |
| Sr. | Building Name: | C | Building Approval Number: | 1569/2011TVLR | | | | | | | | |
| No. | | | | | | | | |
| 3 | SanctionedBuiltUp Area(sqm): | 4051 | Constructed Built Up Area: | 4051 | | | | | | | | |
| ApprovedCarpetArea- Instructional: | 1627 | ConstructedCarpetArea- Instructional: | 1627 | | | | | | | | |
| ApprovedCarpetArea- Administrative: | 440 | ConstructedCarpetArea- Administrative: | 440 | | | | | | | | |
| ApprovedCarpetArea- Amenities: | 210 | Constructed Carpet Area- Amenities: | 210 | | | | | | | | |
| Total Area Approved: | 4051 | Total Area Constructed: | 4051 | | | | | | | | |
| ActivitiesConductedinthe Building: | INSTRUCTIONAL, ADMINISTRATIVE | Non AICTE Approved courses running in the Building (if any): | NO | | | | | | | | |
| BuildingPlanApproving Authority: | Dtcp, Tirunelveli | Building Plan Approval Date: | 6/16/2011 | | | | | | | | |
| Sr. | Building Name: | D | Building Approval Number: | 1569/2011TVLR | | | | | | | | |
| No. | | | | | | | | |
| 4 | SanctionedBuiltUp Area(sqm): | 2939 | Constructed Built Up Area: | 2939 | | | | | | | | |
| ApprovedCarpetArea- Instructional: | 2869 | ConstructedCarpetArea- Instructional: | 2869 | | | | | | | | |
| ApprovedCarpetArea- Administrative: | 70 | ConstructedCarpetArea- Administrative: | 70 | | | | | | | | |
| ApprovedCarpetArea- Amenities: | 0 | Constructed Carpet Area- Amenities: | 0 | | | | | | | | |
| Total Area Approved: | 2869 | Total Area Constructed: | 2869 | | | | | | | | |
| ActivitiesConductedinthe Building: | INSTRUCTIONAL, AMENITIES | Non AICTE Approved courses running in the Building (if any): | NO | | | | | | | | |
| BuildingPlanApproving Authority: | Dtcp, Tirunelveli | Building Plan Approval Date: | 6/16/2011 | | | | | | | | |
| Sr. | Building Name: | E | Building Approval Number: | 1569/2011TVLR | | | | | | | | |
| No. | | | | | | | | |
| 5 | SanctionedBuiltUp Area(sqm): | 1618 | Constructed Built Up Area: | 1618 | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| ApprovedCarpetArea- Instructional: | 1408 | ConstructedCarpetArea- Instructional: | 1408 | | | | | | | | |
| ApprovedCarpetArea- Administrative: | 210 | ConstructedCarpetArea- Administrative: | 210 | | | | | | | | |
| ApprovedCarpetArea- Amenities: | 0 | Constructed Carpet Area- Amenities: | 0 | | | | | | | | |
| Total Area Approved: | 1618 | Total Area Constructed: | 1618 | | | | | | | | |
| ActivitiesConductedinthe Building: | ADMINISTRATIVE AMENITIES | Non AICTE Approved courses running in the Building (if any): | NO | | | | | | | | |
| BuildingPlanApproving Authority: | Dtcp, Tirunelveli | Building Plan Approval Date: | 6/16/2011 | | | | | | | | |
| Sr. | Building Name: | F | Building Approval Number: | 1569/2011TVLR | | | | | | | | |
| No. | | | | | | | | |
| 6 | SanctionedBuiltUp Area(sqm): | 350 | Constructed Built Up Area: | 350 | | | | | | | | |
| ApprovedCarpetArea- Instructional: | 0 | ConstructedCarpetArea- Instructional: | 0 | | | | | | | | |
| ApprovedCarpetArea- Administrative: | 0 | ConstructedCarpetArea- Administrative: | 0 | | | | | | | | |
| ApprovedCarpetArea- Amenities: | 350 | Constructed Carpet Area- Amenities: | 350 | | | | | | | | |
| Total Area Approved: | 350 | Total Area Constructed: | 350 | | | | | | | | |
| ActivitiesConductedinthe Building: | CAFETERIA | Non AICTE Approved courses running in the Building (if any): | NO | | | | | | | | |
| BuildingPlanApproving Authority: | Dtcp, Tirunelveli | Building Plan Approval Date: | 6/16/2011 | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Automobile Engineering | | | | | | | | |
| No. | | | | | | | | |
| 1 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | Automotive Components | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Mobile And Components | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Automobile Engineering | | | | | | | | |
| No. | | | | | | | | |
| 2 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | Automotive Components Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Multi Cylinder Petrol Engine,MultiCylinder Diesel Engine,Light DutyVehicleChassis Frame | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | MANAGEMENT | Department: | Management | | | | | | | | |
| No. | | | | | | | | |
| 3 | Course: | Data Not Available | Level: | Post Graduate | | | | | | | | |
| Name of the Laboratory: | BusinessApplication SoftwareLab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | PentiumIvWith2Gb Ram, | Building Name | D | | | | | | | | |
| 160 Gb Hard Disk, Monitor 1024 X 768 | | | | | | | | |
| Colour 60 Hz. Windows,MsOffice, | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Civil Engineering | | | | | | | | |
| No. | | | | | | | | |
| 4 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | Cad Lab | Is it Research lab for PG | No | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | Course(Y/N): | | | | | | | | | |
| Lab / Major Equipments: | PcPentiumComputers, Plotter, Autocad Software, Analysis And Design Software | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 5 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Cad/Cam Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Computer Server, Computer Nodes Or Systems, A3 Size Plotter,LaserPrinter, Cad/Cam Software, Cam So | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | ComputerScienceAnd Engineering | | | | | | | | |
| No. | | | | | | | | |
| 6 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Case Tools Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | PentiumIvComputers, Windows Xp, Rational Rose Software | Building Name | B | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics And Communications Engineering | | | | | | | | |
| No. | | | | | | | | |
| 7 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Communication Systems Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Cro20Mhz,Function Generator, Powr Supply,BreadBoard, Am Transceive Kit, Pcm | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics And Communications Engineering | | | | | | | | |
| No. | | | | | | | | |
| 8 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Communication SystemsLaboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Cro – 20 Mhz FunctionGenerator(1 Mhz ) | Building Name | C | | | | | | | | |
| PowerSupply(0-30 Volts Variable | | | | | | | | |
| ( Ic Power Supply) | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Automobile Engineering | | | | | | | | |
| No. | | | | | | | | |
| 9 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ComputerAided Machine | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | ComputerScienceAnd Engineering | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 10 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Computer Aided MachineDrawingLab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Lab / Major Equipments: | ComputerSystem30 Nos,LaserPrinter01 No, Plotter 01 No, Software, Autocad, Solid Edge | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Automobile Engineering | | | | | | | | |
| No. | | | | | | | | |
| 11 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Computer Aided MachineDrawing Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | ComputerNodes, Autocad | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 12 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ComputerAided Simulation And Analysis Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Computer System, 17"VgaColourMonitor, 40GbHdd,ClourDesk Jet Printer, Suitable Analysis Softare | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Information Technology | | | | | | | | |
| No. | | | | | | | | |
| 13 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ComputerGraphics Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | PentiumIvWith2Gb Ram, | Building Name | D | | | | | | | | |
| 160 Gb Hard Disk, Monitor 1024 X 768 | | | | | | | | |
| Colour 60 Hz. | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | ComputerScienceAnd Engineering | | | | | | | | |
| No. | | | | | | | | |
| 14 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Computer Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | PentiumIvComputers, Windows Xp, Turbo C | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | ComputerScienceAnd Engineering | | | | | | | | |
| No. | | | | | | | | |
| 15 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Computer Lab I | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | PentiumIvComputers, Linux Os, J2Sdk, C++ Compiler, Ns2 | Building Name | B | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics And Communications Engineering | | | | | | | | |
| No. | | | | | | | | |
| 16 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ComputerNetworks Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Lan Trainer Kit, NetworkSimulation Toll,OnlineDouble Conversion Ups Systeme | Building Name | C | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics And Communications Engineering | | | | | | | | |
| No. | | | | | | | | |
| 17 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ComputerNetworks Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Pentium Iv Computers | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Civil Engineering | | | | | | | | |
| No. | | | | | | | | |
| 18 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Concrete Aided Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Concrete | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Civil Engineering | | | | | | | | |
| No. | | | | | | | | |
| 19 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ConcreteAndHigh Way Engg Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Lab Equipments | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 20 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ControlSystems Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | DcServoMotor Tachometer MultimeterStop Watch | Building Name | C | | | | | | | | |
| AcServoMotor Tachometer | | | | | | | | |
| Rigged Up Models Of | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Agriculture Engineering | | | | | | | | |
| No. | | | | | | | | |
| 21 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | CraftHusbandary Labaratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Field Preparation, BiometricObservation, Harvesting, Post Harvesting | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Communication Systems | | | | | | | | |
| No. | | | | | | | | |
| 22 | Course: | Data Not Available | Level: | Post Graduate | | | | | | | | |
| Name of the Laboratory: | Cs Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Mounting Brackets | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Information Technology | | | | | | | | |
| No. | | | | | | | | |
| 23 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | DataStructuresAnd Algorithms Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | PentiumIvComputers, Windows Xp,C++ | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 24 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | Data Structures And | Is it Research lab for PG | No | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | Algorithms Laboratory | Course(Y/N): | | | | | | | | | |
| Lab / Major Equipments: | Computer(Pentium4) Dot Matrix Printer Laser Printer | Building Name | C | | | | | | | | |
| Ups (5 Kva) | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | ComputerScienceAnd Engineering | | | | | | | | |
| No. | | | | | | | | |
| 25 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | DataStructuresLab, Os Lab, Networking Lab, Os Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | ComputerPiv Software | Building Name | B | | | | | | | | |
| I) C/C++, Java` | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Information Technology | | | | | | | | |
| No. | | | | | | | | |
| 26 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Dbms | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | 30PersonalComputers Vb/Vc ++/Java | Building Name | D | | | | | | | | |
| Oracle11G,MySql, Db2 | | | | | | | | |
| Windows 2000 Professional/Xp | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | ComputerScienceAnd Engineering | | | | | | | | |
| No. | | | | | | | | |
| 27 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Dbms Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | PentiumIvComputers, Windows Xp, Oracle 8I | Building Name | B | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics And Communications Engineering | | | | | | | | |
| No. | | | | | | | | |
| 28 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Digital Electronics Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Digital Ic Tester Power Supply Multimeter ComputerWithHdl Software Installed | Building Name | B | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | ComputerScienceAnd Engineering | | | | | | | | |
| No. | | | | | | | | |
| 29 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Digital Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Dual Power Supply, Ic TrainerKit,Computers, Hdl Software, Ics | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Information Technology | | | | | | | | |
| No. | | | | | | | | |
| 30 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Digital Laboratory I | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | DualPowerSupply/ SingleModePower Supply | Building Name | D | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | IcTrainerBread Boards Multimeter | | | | | | | | | | |
| Computer With Hdl | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics And Communications Engineering | | | | | | | | |
| No. | | | | | | | | |
| 31 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Digital Signal ProcessingLaboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Pcs With Fixed / Floating Point Dsp Processors(Kit/Add- On Cards) | Building Name | B | | | | | | | | |
| MatlabWithSimulink And Signal | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 32 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Dynamic Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Cam Analyxer, MotorisedGyroscope, Governor Apparatus, Whirling Of Shaft Aparaus | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics And Communications Engineering | | | | | | | | |
| No. | | | | | | | | |
| 33 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | ElectricalEngineering And Control System Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | MotorGeneratorSet Rheostat | Building Name | B | | | | | | | | |
| VoltmeterDc Ammeter Dc Dpst Switch | | | | | | | | |
| ThreePointStarter Tachomete | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 34 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ElectricalEngineering Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Dc Shunt Motor, Dc SeriesMotor,DcShunt Motor-Dc Shunt Generator Set, Dc Shunt Motor-Dc Series Gen | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 35 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ElectricalMachinesIi Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Dc Shunt Motor CoupledThreePhase Alternator Synchronous Motor Coupled To Dc Motor | Building Name | C | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | Three Phase In | | | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 36 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ElectricalMachines Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Dc Motor, Dc Shunt Motor,DcSeriesMotor | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 37 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Electrical Machines | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Laboratory –I | | | | | | | | |
| Lab / Major Equipments: | D.CMotor–Generator Set | Building Name | D | | | | | | | | |
| D.CMotor–Shunt Generator | | | | | | | | |
| D.CMotor–Compound Generator | | | | | | | | |
| D.C. Shunt M | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 38 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ElectronicCircuits–I Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | VariableDcPower Supply | Building Name | D | | | | | | | | |
| Cro Multimeter | | | | | | | | |
| FunctionGenerator Dc Ammeter | | | | | | | | |
| Dc Voltmeter | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics & CommunicationEngg | | | | | | | | |
| No. | | | | | | | | |
| 39 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | ElectronicCircuityIi Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Variable Dc Power Supply Cro Multimeter FunctionGeneratorDc Ammeter Dc Voltmeter | Building Name | B | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Automobile Engineering | | | | | | | | |
| No. | | | | | | | | |
| 40 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Electronics And Microprocessors | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Device Characteristics (For Scr, Mosfet, Triac Igbt) Kit With Built In PowerSupply&Meters Scr F | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics And Communications Engineering | | | | | | | | |
| No. | | | | | | | | |
| 41 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ElectronicsSystem Design Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Buck-BoostConverters, Ac/Dc Voltage | Building Name | B | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | Regulator, Process ControlTimer,Micro Controller Based System | | | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics & CommunicationEngg | | | | | | | | |
| No. | | | | | | | | |
| 42 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | EmbeddedSystems Lab | IsitResearchlabforPG Course(Y/N): | Yes | | | | | | | | |
| Lab / Major Equipments: | Systems Oftwares | Building Name | B | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Automobile Engineering | | | | | | | | |
| No. | | | | | | | | |
| 43 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Engine Performance And Emission Testing | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Engines Emission | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Automobile Engineering | | | | | | | | |
| No. | | | | | | | | |
| 44 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Engine Performance AndEmissionTesting Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Hydraulic Dynamometer,ElectricalDynamometer,Automoti ve Multicylinder Si Engine Test Rig With Heat B | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | EmbeddedSystems Technology | | | | | | | | |
| No. | | | | | | | | |
| 45 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Est I &Ii | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | 8BitMicrocontroller, Processor | Building Name | E | | | | | | | | |
| Building Number | 5 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Civil Engineering | | | | | | | | |
| No. | | | | | | | | |
| 46 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | EvvironmentalEngg Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Computers | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 47 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Fluid Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Priniter | Building Name | D | | | | | | | | |
| Building Number | 1 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 48 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | FluidMechanicAnd Machinery Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Orifice Meter Setup, VenturiMeterSetup, Ripe Flow Analysis Setup, | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Aeronautical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 49 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | FluidMechanicAnd Machinery Lab. | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Orifice Meter Setup, VenturiMeterSetup, Ripe Flow Analysis Setup, | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Automobile Engineering | | | | | | | | |
| No. | | | | | | | | |
| 50 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | Fluid Mechanic Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Orifice Meter Setup,Pipe Flow AnalysisSetup,Francis Turbine Setup Kaplan Turbine Setup | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 51 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | FluidMechanicsAnd Machinery Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Orifice Meter Setup, Venturi Meter Setup, RotameterSetup,Pipe Flow Analysis Setup, Centrifugal Pum | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Automobile Engineering | | | | | | | | |
| No. | | | | | | | | |
| 52 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | FluidMechanicsAnd Machinery- | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Orifice Meter Setup, VenturiMeterSetup, Ripe Flow Analysis Setup, | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Civil Engineering | | | | | | | | |
| No. | | | | | | | | |
| 53 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | HydraulicEngineering Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Bernoullis Theorem, Measurement Of Velocity, Flow Measurement, Calculation Of MetacentricHeight,Lo | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | ComputerScienceAnd Engineering | | | | | | | | |
| No. | | | | | | | | |
| 54 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | InternetProgramming Lab/Graphics Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | PentiumIvComputers, Windows Xp,C++ | Building Name | E | | | | | | | | |
| Building Number | 5 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Information Technology | | | | | | | | |
| No. | | | | | | | | |
| 55 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Name of the Laboratory: | Java Programming Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | PentiumIvWith2Gb Ram, | Building Name | D | | | | | | | | |
| 160 Gb Hard Disk, Monitor 1024 X 768 | | | | | | | | |
| Colour 60 Hz. Windows/LinuxOpera | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 56 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Lectrical Cirucuit Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Wires Electric Chargers | Building Name | E | | | | | | | | |
| Building Number | 5 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 57 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Linear And Digital IntegratedCircuits Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | InterfaceSuchAs,A/D, D/A Converter, | Building Name | C | | | | | | | | |
| Dma, Pic Serial, Interface, Temperatures Controller,Steppe | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics And Communications Engineering | | | | | | | | |
| No. | | | | | | | | |
| 58 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | LinearIntegrated Circuits Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Dual,(0-30V)Variable Power Supply | Building Name | B | | | | | | | | |
| Cro | | | | | | | | |
| Digital Multimeter FunctionGenerator Ic Tester (Analog) | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 59 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | Manufacturing TechnologgyLabIi | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Cenre Laths, Turret AndCapstanLathes, Horizontal Milling Machine, Vertical Muilling Machine, | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 60 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Manufacturing TechnologyLab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Central Lathe, Arc Welding, Gas Welding, BrazingMachine,Hand Shear, Bench Vice, Injection Moulding | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Aeronautical Engineering | | | | | | | | |
| No. | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| 61 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | Manufacturing TechnologyLab- | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Cenre Laths, Turret AndCapstanLathes, Horizontal Milling Machine, Vertical Muilling Machine, | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Aeronautical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 62 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | Manufacturing TechnologyLabFor Aero | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Centre Lathe With Accessories,Slotting Machine,Upright Drilling Machine | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 63 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | Manufacturing TechnologyLabIi | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | CentreLathes,Turret AndCapstanLathes, Horizontal Milling Machine, Vertical Milling Machine, Surf | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Automobile Engineering | | | | | | | | |
| No. | | | | | | | | |
| 64 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | Manufacturing TechnologyLab- | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Central Lathe, Arc Welding, Gas Welding, BrazingMachine,Hand Shear, Bench Vice, Injection Moulding | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 65 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | MeasurementsAnd Instrumentation Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Lvdt KitMultimeter BourdonPressure Transducer Kit Foot Pump | Building Name | D | | | | | | | | |
| Maxwell'SInductance Capacitance B | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 66 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Mechtronics Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | BasicpneumaticTrainer Kit, Basic Hydraulic Trainer Kit, Hydraulic And Pneumatics Systems Simulation | Building Name | D | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 67 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Metrology And MeasurementLab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Micormeter, Vernier Caliper, Vernier Height Guage, Vernier Depth Guage,SlipGaugeSet, Sine Bar, Si | Building Name | D | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 68 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | MicroprocessorAnd Micro Controller Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | 8085Microprocessor Trainer With | Building Name | C | | | | | | | | |
| Power Supply | | | | | | | | |
| 8051MicroController Trainer Kit With Power Supply | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics And Communications Engineering | | | | | | | | |
| No. | | | | | | | | |
| 69 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | MicroprocessorAnd Microcontroller Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | 8086 Trainer | Building Name | B | | | | | | | | |
| 8051 Trainer | | | | | | | | |
| 8255 Interfacing Card | | | | | | | | |
| 8279 Interfacing Card | | | | | | | | |
| 8259 Interfacing Card | | | | | | | | |
| 825 | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | ComputerScienceAnd Engineering | | | | | | | | |
| No. | | | | | | | | |
| 70 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Microprocessor Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | 8085 Trainer Kit, Pc, Simulator Software, 8051TrainerKit,Cro, InterfaceModulesFor Traffic Contr | Building Name | B | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Information Technology | | | | | | | | |
| No. | | | | | | | | |
| 71 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Microprocessors Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | 8085TrainerKitWith Onboard 8255, 8253, | Building Name | D | | | | | | | | |
| 8279 And 8251 –15 | | | | | | | | |
| Nos. | | | | | | | | |
| Tasm/MasmSimulator In Pc (8086 P | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 72 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Object- Oriented ProgrammingLab | Is it Research lab for PG | No | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | Course(Y/N): | | | | | | | | | |
| Lab / Major Equipments: | Computers(Pentium-4) Dot Matrix PrinterLaser Printer | Building Name | C | | | | | | | | |
| Turbo C++ (Java2Sdk) | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Information Technology | | | | | | | | |
| No. | | | | | | | | |
| 73 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Object-Oriented ProgrammingLab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | PentiumIvComputers, Windows Xp,C++ | Building Name | E | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Information Technology | | | | | | | | |
| No. | | | | | | | | |
| 74 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Ooad Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Argouml, Eclipse Ide, VisualParadigm,Visual Case, And Rational Suite | Building Name | B | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics And Communications Engineering | | | | | | | | |
| No. | | | | | | | | |
| 75 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Oop Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | PIvComputerVariable Dc Power Supply | Building Name | B | | | | | | | | |
| C And C++ Compiler | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics And Communications Engineering | | | | | | | | |
| No. | | | | | | | | |
| 76 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | OpticalAndMicrowave Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | PowerSource,Klystron PowerSupply,Klystron Mount, Isolator, Frequency Meter, Variable Attenator, | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | PowerElectronicsAnd Drives | | | | | | | | |
| No. | | | | | | | | |
| 77 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Ped Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Computer,Pcs, Printers | Building Name | E | | | | | | | | |
| Building Number | 5 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 78 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | PowerElectronics Laboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Device Characteristics (For Scr, Mosfet, Triac Igbt) Kit With Built In PowerSupply&Meters Scr F | Building Name | C | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 79 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | PowerSystem Simulation Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | PersonalComputer, Printer Laser, Dotmatrix, Server, Software,Compliers | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 80 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Power System SimulationLaboratory | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Personal Computers (Pentium-Iv,80Gb,512 Mbram) | Building Name | C | | | | | | | | |
| PrinterLaser Dotmatrix | | | | | | | | |
| Server(PentiumIv, 80G | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 81 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Power Systems Simulation Lab I | IsitResearchlabforPG Course(Y/N): | Yes | | | | | | | | |
| Lab / Major Equipments: | Computer 30 Nos, Printer,MatLabEtab | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electrical And ElectronicsEngineering | | | | | | | | |
| No. | | | | | | | | |
| 82 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Power Systems Simulation Lab Ii | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Computer 30 Nos, Matlab,Etab,Printers, Sotwares | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Information Technology | | | | | | | | |
| No. | | | | | | | | |
| 83 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Sevice Oracle Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | SystemSoftwars, Computers | Building Name | B | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 84 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | Sm Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Universal Tensile TestingMachineWith Double Shear Attachment, Torsion Testing Machine (60 Nm Capac | Building Name | B | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Civil Engineering | | | | | | | | |
| No. | | | | | | | | |
| 85 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Soil Mechanics Lab | Is it Research lab for PG | No | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | Course(Y/N): | | | | | | | | | |
| Lab / Major Equipments: | Sieves, Hdromeer, LiquidAndPlasticLimit Apparatus, Shinkagelimit Apparatus, Proctor Compaction Ap | Building Name | A | | | | | | | | |
| Building Number | 1 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 86 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | Strength Materials Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | UniversalTensile TestingMachine, Torsion Testing Machine, Impact TestingMachine, Brinell Hardness | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Civil Engineering | | | | | | | | |
| No. | | | | | | | | |
| 87 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Strength Of Materials | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Utm 400 Kn, Torzion Testin Gmachine, Izod Impact Testing Machine, Hardnes TestingMachine,Beam Defl | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Aeronautical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 88 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Strength Of Materials .. | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | UniversalTensile TestingMachine, Torsion Testing Machine, Impact TestingMachine, Brinell Hardness | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Civil Engineering | | | | | | | | |
| No. | | | | | | | | |
| 89 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | StrengthOfMaterials Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Utm, Torsion Testing Machine,IzodImpact Testing Machine, Hardness Test Apparatus, Beam Deflection | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Automobile Engineering | | | | | | | | |
| No. | | | | | | | | |
| 90 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | StrengthOfMaterials Labs | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | UniversalTensile TestingMachine, Torsion Testing Machine, Impact TestingMachine, | Building Name | C | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | Brinell Hardness | | | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Civil Engineering | | | | | | | | |
| No. | | | | | | | | |
| 91 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Surevey Practical Ii | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Total Station, Theodolites,Dumpy Level, Plain Table, Pocket Stereoscpe, Rangine Rods, Leveling Staf | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Civil Engineering | | | | | | | | |
| No. | | | | | | | | |
| 92 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Survey Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Total Station, Plane Table, Theodolite, DumpyLevel,Pocket Stereoscope | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Information Technology | | | | | | | | |
| No. | | | | | | | | |
| 93 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | System Software Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Hardware–PentiumPc Desktops | Building Name | B | | | | | | | | |
| Software Turboc – | | | | | | | | |
| (Freely Download) | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 94 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ThermalEngineering Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | IcEngine2Stroke,Red Wood Viscometer, Apparatus For Flash And R=Fire Point, 4 Stroke Diesel Engine | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Thermal Engineering | | | | | | | | |
| No. | | | | | | | | |
| 95 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ThermalEngineering Lab Pg | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Computer, Hardwares | Building Name | C | | | | | | | | |
| Building Number | 3 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Mechanical Engineering | | | | | | | | |
| No. | | | | | | | | |
| 96 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | ThermalEngineering Lab Vi | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Guarded Plate Apparatus, Lagged Pipe Apparatus, Natural Convection, ForcedConvection,In- Fin Appara | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERING AND | Department: | Aeronautical | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| No. | | TECHNOLOGY | | Engineering | | | | | | | | |
| 97 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Thermodynamic Lab. | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | IcEngine2Stroke,Red Wood Viscometer, Apparatus For Flash And R=Fire Point, 4 Stroke Diesel Engine | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Automobile Engineering | | | | | | | | |
| No. | | | | | | | | |
| 98 | Course: | Data Not Available | Level: | Under Graduate | | | | | | | | |
| Name of the Laboratory: | VehicleMaintenance Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Byke, Car, Engines | Building Name | D | | | | | | | | |
| Building Number | Data Not Available | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Electronics & CommunicationEngg | | | | | | | | |
| No. | | | | | | | | |
| 99 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Vlsi Design Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Computers | Building Name | B | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | Information Technology | | | | | | | | |
| No. | | | | | | | | |
| 100 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | WebTechnology Lab | IsitResearchlabforPG Course(Y/N): | No | | | | | | | | |
| Lab / Major Equipments: | Web Cam | Building Name | D | | | | | | | | |
| Building Number | 4 | | | | | | | | |
| Sr. | Programme: | ENGINEERINGAND TECHNOLOGY | Department: | ComputerScience&Engineering | | | | | | | | |
| No. | | | | | | | | |
| 101 | Course: | Data Not Available | Level: | Data Not Available | | | | | | | | |
| Name of the Laboratory: | Web Technology Lab | IsitResearchlabforPG Course(Y/N): | Yes | | | | | | | | |
| Lab / Major Equipments: | Web Cam | Building Name | B | | | | | | | | |
| Building Number | 2 | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Room ID/ Name: | A103 | Room Type: | Office All Inclusive | | | | | | | | |
| No. | | | | | | | | |
| 1 | Area in Sqm: | 150 | Building Name: | A | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | A105A | Room Type: | Security | | | | | | | | |
| No. | | | | | | | | |
| 2 | Area in Sqm: | 22 | Building Name: | A | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | A108 | Room Type: | Central Store | | | | | | | | |
| No. | | | | | | | | |
| 3 | Area in Sqm: | 70 | Building Name: | A | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | A202 | Room Type: | Office All Inclusive | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| No. | | | | | | | | | | | | |
| 4 | Area in Sqm: | 150 | Building Name: | A | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | A301 | Room Type: | Maintenance | | | | | | | | |
| No. | | | | | | | | |
| 5 | Area in Sqm: | 44 | Building Name: | A | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | A302 | Room Type: | Housekeeping | | | | | | | | |
| No. | | | | | | | | |
| 6 | Area in Sqm: | 22 | Building Name: | A | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | A303 | Room Type: | Pantry for Staff | | | | | | | | |
| No. | | | | | | | | |
| 7 | Area in Sqm: | 44 | Building Name: | A | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | A304 | Room Type: | Exam Control Office | | | | | | | | |
| No. | | | | | | | | |
| 8 | Area in Sqm: | 66 | Building Name: | A | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | A305 | Room Type: | Placement Office | | | | | | | | |
| No. | | | | | | | | |
| 9 | Area in Sqm: | 66 | Building Name: | A | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Planned | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | A306 | Room Type: | Faculty Room | | | | | | | | |
| No. | | | | | | | | |
| 10 | Area in Sqm: | 66 | Building Name: | A | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | B305 | Room Type: | Cabin for Head of Dept | | | | | | | | |
| No. | | | | | | | | |
| 11 | Area in Sqm: | 30 | Building Name: | B | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | B305A | Room Type: | Faculty Room | | | | | | | | |
| No. | | | | | | | | |
| 12 | Area in Sqm: | 40 | Building Name: | B | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | C101 | Room Type: | PrincipalDirectors Office | | | | | | | | |
| No. | | | | | | | | |
| 13 | Area in Sqm: | 70 | Building Name: | C | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | C102 | Room Type: | Board Room | | | | | | | | |
| No. | | | | | | | | |
| 14 | Area in Sqm: | 70 | Building Name: | C | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | C106 | Room Type: | Cabin for Head of Dept | | | | | | | | |
| No. | | | | | | | | |
| 15 | Area in Sqm: | 40 | Building Name: | C | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | C111 | Room Type: | Faculty Room | | | | | | | | |
| No. | | | | | | | | |
| 16 | Area in Sqm: | 70 | Building Name: | C | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | C201 | Room Type: | Faculty Room | | | | | | | | |
| No. | | | | | | | | |
| 17 | Area in Sqm: | 70 | Building Name: | C | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | C206 | Room Type: | Cabin for Head of Dept | | | | | | | | |
| No. | | | | | | | | |
| 18 | Area in Sqm: | 40 | Building Name: | C | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | C307 | Room Type: | Cabin for Head of Dept | | | | | | | | |
| No. | | | | | | | | |
| 19 | Area in Sqm: | 40 | Building Name: | C | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | C312 | Room Type: | Cabin for Head of Dept | | | | | | | | |
| No. | | | | | | | | |
| 20 | Area in Sqm: | 10 | Building Name: | C | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | C405 | Room Type: | Cabin for Head of Dept | | | | | | | | |
| No. | | | | | | | | |
| 21 | Area in Sqm: | 40 | Building Name: | C | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | D201 | Room Type: | Cabin for Head of Dept | | | | | | | | |
| No. | | | | | | | | |
| 22 | Area in Sqm: | 30 | Building Name: | D | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | D201A | Room Type: | Faculty Room | | | | | | | | |
| No. | | | | | | | | |
| 23 | Area in Sqm: | 40 | Building Name: | D | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | E103 | Room Type: | Cabin for Head of Dept | | | | | | | | |
| No. | | | | | | | | |
| 24 | Area in Sqm: | 30 | Building Name: | E | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | E103A | Room Type: | Faculty Room | | | | | | | | |
| No. | | | | | | | | |
| 25 | Area in Sqm: | 40 | Building Name: | E | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | E204 | Room Type: | Faculty Room | | | | | | | | |
| No. | | | | | | | | |
| 26 | Area in Sqm: | 70 | Building Name: | E | | | | | | | | |
| Building Number: | Data Not Available | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Room ID/ Name: | A102 | Room Type: | FirstaidcumSick Room | | | | | | | | |
| No. | | | | | | | | |
| 1 | Area in Sqm: | 22 | Building Name: | A | | | | | | | | |
| Building Number: | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | A109 | Room Type: | Stationery Store | | | | | | | | |
| No. | | | | | | | | |
| 2 | Area in Sqm: | 22 | Building Name: | A | | | | | | | | |
| Building Number: | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | A201 | Room Type: | Boys Common Room | | | | | | | | |
| No. | | | | | | | | |
| 3 | Area in Sqm: | 110 | Building Name: | A | | | | | | | | |
| Building Number: | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Room ID/ Name: | A204 | Room Type: | Girls Common Room | | | | | | | | |
| No. | | | | | | | | |
| 4 | Area in Sqm: | 110 | Building Name: | A | | | | | | | | |
| Building Number: | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | A205 | Room Type: | Toilet | | | | | | | | |
| No. | | | | | | | | |
| 5 | Area in Sqm: | 44 | Building Name: | A | | | | | | | | |
| Building Number: | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | B205 | Room Type: | Toilet | | | | | | | | |
| No. | | | | | | | | |
| 6 | Area in Sqm: | 40 | Building Name: | B | | | | | | | | |
| Building Number: | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | B309 | Room Type: | Toilet | | | | | | | | |
| No. | | | | | | | | |
| 7 | Area in Sqm: | 40 | Building Name: | B | | | | | | | | |
| Building Number: | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | B406 | Room Type: | Toilet | | | | | | | | |
| No. | | | | | | | | |
| 8 | Area in Sqm: | 40 | Building Name: | B | | | | | | | | |
| Building Number: | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | C212 | Room Type: | Toilet | | | | | | | | |
| No. | | | | | | | | |
| 9 | Area in Sqm: | 70 | Building Name: | C | | | | | | | | |
| Building Number: | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | C312 | Room Type: | Toilet | | | | | | | | |
| No. | | | | | | | | |
| 10 | Area in Sqm: | 70 | Building Name: | C | | | | | | | | |
| Building Number: | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | C411 | Room Type: | Toilet | | | | | | | | |
| No. | | | | | | | | |
| 11 | Area in Sqm: | 70 | Building Name: | C | | | | | | | | |
| Building Number: | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| Sr. | Room ID/ Name: | F101 | Room Type: | Cafeteria | | | | | | | | |
| No. | | | | | | | | |
| 12 | Area in Sqm: | 350 | Building Name: | F | | | | | | | | |
| Building Number: | 6 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Air Conditioning | Not Available | Readiness of furniture/fixtures | Ready | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Area Type | Corridors | Average Carpet Area: | 2887 | | | | | | | | |
| No. | | | | | | | | |
| 1 | Flooring | Yes | Painting Done | Ready | | | | | | | | |
| Electrificationand Lighting | Ready | Building Name: | A,B,C,D,E,F,AX, X,BH,LH | | | | | | | | |
| Building Number: | 1,2,3,4,5,6,7 | | | | | | | | |
| Sr. | Area Type | Other Areas (in Sq m) | Average Carpet Area: | 1464 | | | | | | | | |
| No. | | | | | | | | |
| 2 | Flooring | Yes | Painting Done | Ready | | | | | | | | |
| Electrificationand Lighting | Ready | Building Name: | A,B,C,D,E,F,AX, X,BH,LH | | | | | | | | |
| Building Number: | 1,2,3,4,5,6,7 | | | | | | | | |
| Sr. | Area Type | OtherCommonArea(in Sq m) | Average Carpet Area: | 900 | | | | | | | | |
| No. | | | | | | | | |
| 3 | Flooring | Yes | Painting Done | Ready | | | | | | | | |
| Electrificationand Lighting | Ready | Building Name: | A,B,C,D,E,F,AX, X,BH,LH | | | | | | | | |
| Building Number: | 1,2,3,4,5,6,7 | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 1 | Room Type | Laboratory | Room ID/ Name | A101 | | | | | | | | |
| Area of Room in Sqm | 110 | Building Name | A | | | | | | | | |
| Building Number | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | COMPUTER APPLICATIONS | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 2 | Room Type | Classroom | Room ID/ Name | A112 | | | | | | | | |
| Area of Room in Sqm | 66 | Building Name | A | | | | | | | | |
| Building Number | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | COMPUTER APPLICATIONS | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 3 | Room Type | Tutorial Room | Room ID/ Name | A113 | | | | | | | | |
| Area of Room in Sqm | 33 | Building Name | A | | | | | | | | |
| Building Number | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | COMPUTER APPLICATIONS | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 4 | Room Type | Seminar Hall | Room ID/ Name | A114 | | | | | | | | |
| Area of Room in Sqm | 132 | Building Name | A | | | | | | | | |
| Building Number | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | COMPUTER APPLICATIONS | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| 5 | Room Type | Computer Laboratory | Room ID/ Name | A115 | | | | | | | | |
| Area of Room in Sqm | 66 | Building Name | A | | | | | | | | |
| Building Number | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 6 | Room Type | CAD Center | Room ID/ Name | A116 | | | | | | | | |
| Area of Room in Sqm | 132 | Building Name | A | | | | | | | | |
| Building Number | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 7 | Room Type | Laboratory | Room ID/ Name | A307 | | | | | | | | |
| Area of Room in Sqm | 66 | Building Name | A | | | | | | | | |
| Building Number | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 8 | Room Type | Laboratory | Room ID/ Name | A308 | | | | | | | | |
| Area of Room in Sqm | 66 | Building Name | A | | | | | | | | |
| Building Number | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 9 | Room Type | Laboratory | Room ID/ Name | A309 | | | | | | | | |
| Area of Room in Sqm | 66 | Building Name | A | | | | | | | | |
| Building Number | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 10 | Room Type | Laboratory | Room ID/ Name | A310 | | | | | | | | |
| Area of Room in Sqm | 66 | Building Name | A | | | | | | | | |
| Building Number | 1 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | MANAGEMENT | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 11 | Room Type | Classroom | Room ID/ Name | B201 | | | | | | | | |
| Area of Room in Sqm | 80 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Programme | MANAGEMENT | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 12 | Room Type | Classroom | Room ID/ Name | B202 | | | | | | | | |
| Area of Room in Sqm | 90 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | MANAGEMENT | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 13 | Room Type | Classroom | Room ID/ Name | B203 | | | | | | | | |
| Area of Room in Sqm | 90 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | MANAGEMENT | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 14 | Room Type | Classroom | Room ID/ Name | B204 | | | | | | | | |
| Area of Room in Sqm | 90 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | MANAGEMENT | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 15 | Room Type | Tutorial Room | Room ID/ Name | B206 | | | | | | | | |
| Area of Room in Sqm | 40 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 16 | Room Type | Classroom | Room ID/ Name | B301 | | | | | | | | |
| Area of Room in Sqm | 40 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 17 | Room Type | Classroom | Room ID/ Name | B302 | | | | | | | | |
| Area of Room in Sqm | 40 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 18 | Room Type | Classroom | Room ID/ Name | B303 | | | | | | | | |
| Area of Room in Sqm | 40 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 19 | Room Type | Classroom | Room ID/ Name | B304 | | | | | | | | |
| Area of Room in Sqm | 40 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 20 | Room Type | Classroom | Room ID/ Name | B306 | | | | | | | | |
| Area of Room in Sqm | 40 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 21 | Room Type | Classroom | Room ID/ Name | B307 | | | | | | | | |
| Area of Room in Sqm | 40 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 22 | Room Type | Classroom | Room ID/ Name | B308 | | | | | | | | |
| Area of Room in Sqm | 40 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | MANAGEMENT | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 23 | Room Type | Classroom | Room ID/ Name | B310 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | MANAGEMENT | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 24 | Room Type | Language Laboratory | Room ID/ Name | B331 | | | | | | | | |
| Area of Room in Sqm | 33 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | COMPUTER APPLICATIONS | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 25 | Room Type | Classroom | Room ID/ Name | B333 | | | | | | | | |
| Area of Room in Sqm | 66 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | COMPUTER APPLICATIONS | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 26 | Room Type | Language Laboratory | Room ID/ Name | B390 | | | | | | | | |
| Area of Room in Sqm | 33 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | MANAGEMENT | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 27 | Room Type | Seminar Hall | Room ID/ Name | B401 | | | | | | | | |
| Area of Room in Sqm | 160 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 28 | Room Type | Tutorial Room | Room ID/ Name | B402 | | | | | | | | |
| Area of Room in Sqm | 40 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 29 | Room Type | Tutorial Room | Room ID/ Name | B403 | | | | | | | | |
| Area of Room in Sqm | 40 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | MANAGEMENT | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 30 | Room Type | Tutorial Room | Room ID/ Name | B404 | | | | | | | | |
| Area of Room in Sqm | 40 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 31 | Room Type | Research Laboratory | Room ID/ Name | B405 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | B | | | | | | | | |
| Building Number | 2 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 32 | Room Type | Classroom | Room ID/ Name | C104 | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 33 | Room Type | Classroom | Room ID/ Name | C105 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 34 | Room Type | Laboratory | Room ID/ Name | C107 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 35 | Room Type | Laboratory | Room ID/ Name | C108 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 36 | Room Type | Laboratory | Room ID/ Name | C109 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 37 | Room Type | Laboratory | Room ID/ Name | C110 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 38 | Room Type | Computer Centre | Room ID/ Name | C200 | | | | | | | | |
| Area of Room in Sqm | 150 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| No. | | | | | | | | | | | | |
| 39 | Room Type | Computer Centre | Room ID/ Name | C201 | | | | | | | | |
| Area of Room in Sqm | 160 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 40 | Room Type | Classroom | Room ID/ Name | C202 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 41 | Room Type | Classroom | Room ID/ Name | C203 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 42 | Room Type | Classroom | Room ID/ Name | C204 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 43 | Room Type | Classroom | Room ID/ Name | C205 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 44 | Room Type | Classroom | Room ID/ Name | C207 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 45 | Room Type | Classroom | Room ID/ Name | C208 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of | Ready | Air Conditioning | Not Available | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| furniture/fixtures | | | | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 46 | Room Type | Classroom | Room ID/ Name | C209 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 47 | Room Type | Classroom | Room ID/ Name | C210 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 48 | Room Type | Classroom | Room ID/ Name | C211 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | MANAGEMENT | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 49 | Room Type | Computer Centre | Room ID/ Name | C213 | | | | | | | | |
| Area of Room in Sqm | 150 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 50 | Room Type | Classroom | Room ID/ Name | C301 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 51 | Room Type | Classroom | Room ID/ Name | C302 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 52 | Room Type | Classroom | Room ID/ Name | C303 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| Readiness of Wall and | Ready | Readiness of Electrification and | Ready | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Painting | | Lighting | | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 53 | Room Type | Classroom | Room ID/ Name | C304 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 54 | Room Type | Classroom | Room ID/ Name | C305 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 55 | Room Type | Classroom | Room ID/ Name | C306 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 56 | Room Type | Laboratory | Room ID/ Name | C308 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 57 | Room Type | Laboratory | Room ID/ Name | C309 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 58 | Room Type | Laboratory | Room ID/ Name | C310 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 59 | Room Type | Laboratory | Room ID/ Name | C311 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | COMPUTER APPLICATIONS | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 60 | Room Type | Computer Centre | Room ID/ Name | C335 | | | | | | | | |
| Area of Room in Sqm | 160 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 61 | Room Type | Laboratory | Room ID/ Name | C401 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 62 | Room Type | Laboratory | Room ID/ Name | C402 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 63 | Room Type | Laboratory | Room ID/ Name | C403 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 64 | Room Type | Laboratory | Room ID/ Name | C404 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 65 | Room Type | Laboratory | Room ID/ Name | C406 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| 66 | Room Type | Laboratory | Room ID/ Name | C407 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 67 | Room Type | Laboratory | Room ID/ Name | C408 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 68 | Room Type | Laboratory | Room ID/ Name | C409 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 69 | Room Type | Laboratory | Room ID/ Name | C410 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | C | | | | | | | | |
| Building Number | 3 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 70 | Room Type | Workshop | Room ID/ Name | D101 | | | | | | | | |
| Area of Room in Sqm | 205 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 71 | Room Type | Additional Workshop | Room ID/ Name | D102 | | | | | | | | |
| Area of Room in Sqm | 205 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 72 | Room Type | Laboratory | Room ID/ Name | D103 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 73 | Room Type | Laboratory | Room ID/ Name | D104 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 74 | Room Type | Laboratory | Room ID/ Name | D105 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 75 | Room Type | Laboratory | Room ID/ Name | D106 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 76 | Room Type | Workshop | Room ID/ Name | D110 | | | | | | | | |
| Area of Room in Sqm | 200 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 77 | Room Type | Workshop | Room ID/ Name | D111 | | | | | | | | |
| Area of Room in Sqm | 200 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 78 | Room Type | Laboratory | Room ID/ Name | D202 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 79 | Room Type | Laboratory | Room ID/ Name | D203 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 80 | Room Type | Laboratory | Room ID/ Name | D204 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 81 | Room Type | Laboratory | Room ID/ Name | D205 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 82 | Room Type | Laboratory | Room ID/ Name | D206 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 83 | Room Type | Laboratory | Room ID/ Name | D207 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 84 | Room Type | Laboratory | Room ID/ Name | D208 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 85 | Room Type | Laboratory | Room ID/ Name | D209 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 86 | Room Type | Tutorial Room | Room ID/ Name | D210 | | | | | | | | |
| Area of Room in Sqm | 35 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 87 | Room Type | Tutorial Room | Room ID/ Name | D211 | | | | | | | | |
| Area of Room in Sqm | 35 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 88 | Room Type | CAD Center | Room ID/ Name | D301 | | | | | | | | |
| Area of Room in Sqm | 140 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 89 | Room Type | Seminar Hall | Room ID/ Name | D302 | | | | | | | | |
| Area of Room in Sqm | 140 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 90 | Room Type | Laboratory | Room ID/ Name | D303 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 91 | Room Type | Laboratory | Room ID/ Name | D304 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 92 | Room Type | Laboratory | Room ID/ Name | D305 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 93 | Room Type | Laboratory | Room ID/ Name | D306 | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 94 | Room Type | Laboratory | Room ID/ Name | D307 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 95 | Room Type | Tutorial Room | Room ID/ Name | D308 | | | | | | | | |
| Area of Room in Sqm | 35 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 96 | Room Type | Tutorial Room | Room ID/ Name | D309 | | | | | | | | |
| Area of Room in Sqm | 35 | Building Name | D | | | | | | | | |
| Building Number | 4 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 97 | Room Type | Laboratory | Room ID/ Name | E101 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | E | | | | | | | | |
| Building Number | 5 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 98 | Room Type | Laboratory | Room ID/ Name | E102 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | E | | | | | | | | |
| Building Number | 5 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 99 | Room Type | Laboratory | Room ID/ Name | E104 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | E | | | | | | | | |
| Building Number | 5 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| No. | | | | | | | | | | | | |
| 100 | Room Type | Laboratory | Room ID/ Name | E201 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | E | | | | | | | | |
| Building Number | 5 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 101 | Room Type | Laboratory | Room ID/ Name | E202 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | E | | | | | | | | |
| Building Number | 5 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 102 | Room Type | Laboratory | Room ID/ Name | E203 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | E | | | | | | | | |
| Building Number | 5 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | POST GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 103 | Room Type | Laboratory | Room ID/ Name | E301 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | E | | | | | | | | |
| Building Number | 5 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 104 | Room Type | Laboratory | Room ID/ Name | E304 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | E | | | | | | | | |
| Building Number | 5 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Level | UNDER GRADUATE | | | | | | | | |
| No. | | | | | | | | |
| 105 | Room Type | Laboratory | Room ID/ Name | E305 | | | | | | | | |
| Area of Room in Sqm | 70 | Building Name | E | | | | | | | | |
| Building Number | 5 | Readiness of Flooring | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Room Type: | Language Laboratory | Room ID/ Name: | A111 | | | | | | | | |
| No. | | | | | | | | |
| 1 | Area of Room in Sqm: | 33 | Readiness of Flooring: | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of | Ready | Air Conditioning | Not Available | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| furniture/fixtures | | | | | | | | | | | |
| Building Name | AX | Building Number: | 1A | | | | | | | | |
| Sr. | Room Type: | Language Laboratory | Room ID/ Name: | A112 | | | | | | | | |
| No. | | | | | | | | |
| 2 | Area of Room in Sqm: | 33 | Readiness of Flooring: | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Building Name | Data Not Available | Building Number: | Data Not Available | | | | | | | | |
| Sr. | Room Type: | Computer Center | Room ID/ Name: | A115 | | | | | | | | |
| No. | | | | | | | | |
| 3 | Area of Room in Sqm: | 160 | Readiness of Flooring: | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Available | | | | | | | | |
| Building Name | Data Not Available | Building Number: | Data Not Available | | | | | | | | |
| Sr. | Room Type: | Library&Reading Room | Room ID/ Name: | A203 | | | | | | | | |
| No. | | | | | | | | |
| 4 | Area of Room in Sqm: | 420 | Readiness of Flooring: | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Building Name | A | Building Number: | 1 | | | | | | | | |
| Sr. | Room Type: | Computer Center | Room ID/ Name: | B101 | | | | | | | | |
| No. | | | | | | | | |
| 5 | Area of Room in Sqm: | 160 | Readiness of Flooring: | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Available | | | | | | | | |
| Building Name | B | Building Number: | 2 | | | | | | | | |
| Sr. | Room Type: | Library&Reading Room | Room ID/ Name: | B102 | | | | | | | | |
| No. | | | | | | | | |
| 6 | Area of Room in Sqm: | 160 | Readiness of Flooring: | Ready | | | | | | | | |
| ReadinessofWalland Painting | Ready | ReadinessofElectrificationand Lighting | Ready | | | | | | | | |
| Readiness of furniture/fixtures | Ready | Air Conditioning | Not Available | | | | | | | | |
| Building Name | A | Building Number: | 1 | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | WhetherHostelfacility Available(Y/N) ? | Yes | Girl's Hostel (Y/N): | Yes | | | | | | | | |
| No. | | | | | | | | |
| 1 | No. of Rooms: | 100 | Hostel Capacity: | 400 | | | | | | | | |
| Boy's Hostel: | Y | No. of Rooms for Boys? | 200 | | | | | | | | |
| Total Capacity: | 800 | Hostel Facility | Owned | | | | | | | | |
| Location | Within the Campus | Whether Hostel facilities are available for accommodating studentofFN/PIO/OCICategory | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| PCs/Laptopexclusivelyavailableto students: | 351 | PCs/Laptop available in Library: | 12 | | | | | | | | | |
| PCs/Laptopavailablein Administrative Office: | 10 | PCs/LaptopavailabletoFaculty Members: | 24 | | | | | | | | | |
| NumberofPCs/Laptopinlanguage lab: | 26 | Internet Bandwidth in Mbps: | 64 | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| NumberofLegalApplication software: | 52 | Printers available to student: | 25 | | | | | | | | | |
| Number of A1 Size Color Printers: | 1 | Number of Legal System software: | 7 | | | | | | | | | |
| Number of Open Source Software | 12 | Number of Proprietary | 1 | | | | | | | | | |
| | | | | | | | | | | | |
| SOLAR ENERGY DETAILS | | | | | | | | | |
| Totallandavailable (Sqm): | 42069 | No. of buildings with roof tops: | 3 | | | | | | | | | |
| Landavailableforplacingsolar photovoltaic panels (Sqm): | 16618 | AnnualelectricityconsumptionNo. of units during 2024-25: | 25000 | | | | | | | | | |
| Totalapproximateroof-toparea available for placing solar photovoltaic panel (Sqm): | 6171 | Averagerateperunitpaidduring 2024-25 (Rs. / unit): | 5 | | | | | | | | | |
| Renewable Energy Type | SOLAR ENERGY | Remarks: | NIL | | | | | | | | | |
| Whetherapolicyhasbeenadopted to use only LED lamps: | Y | RenewableEnergyusedatpresent (if any): | | | | | | | | | | |
| Yes | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| ANTI-RAGGING | | | | | | | | | | |
| S.No. | Particulars | Status | | | | | | | | | | |
| 1 | Constitution of Anti-Ragging Committee: | Yes | | | | | | | | | | |
| 2 | Constitution of Anti-Ragging Squad: | Yes | | | | | | | | | | |
| 3 | Affidavit obtained from all Students: | Yes | | | | | | | | | | |
| 4 | Affidavit obtained from parents of all the students: | Yes | | | | | | | | | | |
| 5 | Affidavit obtained from students staying in Hostel: | Yes | | | | | | | | | | |
| 6 | Affidavit obtained from parents of students staying in Hostel: | Yes | | | | | | | | | | |
| 7 | Appointment of Counselors: | Yes | | | | | | | | | | |
| | | | | | | | | | | | |
| ANTI-RAGGING COMMITTEE DETAILS | | | | | | | | |
| | | | | | | | |
| Sr. | Committee Type: | Anti-Ragging Committee | AppointmentOrder Reference Number: | A3/MCET/2012 | | | | | | | | |
| No. | | | | | | | | |
| 1 | Date of Appointment: | 1/2/2012 | Name of the CommitteeMember: | MR. JOSEPH | | | | | | | | |
| Profession: | SI | Associated With: | Maria College Of Engg. | | | | | | | | |
| Mobile Number: | 9489916190 | Email Address: | ebabujj@gmail.com | | | | | | | | |
| Sr. | Committee Type: | Anti-Ragging Squad | AppointmentOrder Reference Number: | A3/MCET/2022 | | | | | | | | |
| No. | | | | | | | | |
| 2 | Date of Appointment: | 8/1/2022 | Name of the CommitteeMember: | Mrs. MERLIN SHEEBA S | | | | | | | | |
| Profession: | Asst. Professor | Associated With: | Maria College Of Engg. | | | | | | | | |
| Mobile Number: | 9442856262 | Email Address: | mrlinsheebasms@gmail.com | | | | | | | | |
| Sr. | Committee Type: | Anti-Ragging Squad | AppointmentOrder Reference Number: | A3/MCET/2019 | | | | | | | | |
| No. | | | | | | | | |
| 3 | Date of Appointment: | 7/1/2019 | Name of the CommitteeMember: | Mr.Starlin Mano S G | | | | | | | | |
| Profession: | Associate Professor | Associated With: | Maria College Of Engg. | | | | | | | | |
| Mobile Number: | 9443002758 | Email Address: | starlinmanosg@gmail.com | | | | | | | | |
| Sr. | Committee Type: | Anti-Ragging Squad | AppointmentOrder Reference Number: | A3/MCET2/2021 | | | | | | | | |
| No. | | | | | | | | |
| 4 | Date of Appointment: | 1/4/2021 | Name of the CommitteeMember: | Mr. SHIBU SENTHIL LAL | | | | | | | | |
| Profession: | Associate Professor | Associated With: | Maria College Of Engg. | | | | | | | | |
| Mobile Number: | 9443028428 | Email Address: | lalsshibulla@gmail.com | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. No. | Committee Type: | COMPLAINT COMMITTEE | AppointmentOrder Reference Number: | Supdt/MCET/192021 | | | | | | | | |
| 1 | Date of Appointment: | 7/1/2009 | NameoftheCommittee Member: | MRS. MERLIN SHEEBA | | | | | | | | |
| Profession: | MEMBER | Associated With: | Complaints | | | | | | | | |
| Mobile Number: | 7373057776 | Email Address: | merlinsheeba20@gmail.com | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Designation | TEACHING FACULTY | Gender | Female | | | | | | | | |
| Sr. No. | Committee Type: | COMPLAINT COMMITTEE | AppointmentOrder Reference Number: | Supdt/MCET/19/2021 | | | | | | | | |
| 2 | Date of Appointment: | 1/3/2022 | NameoftheCommittee Member: | Mr. JOHNY S | | | | | | | | |
| Profession: | STUDENT | Associated With: | Complaints | | | | | | | | |
| Mobile Number: | 8100459568 | Email Address: | johnyujohn05@gmail.com | | | | | | | | |
| Designation | STUDENT | Gender | Male | | | | | | | | |
| Sr. No. | Committee Type: | COMPLAINT COMMITTEE | AppointmentOrder Reference Number: | Supdt/MCET/19/2021 | | | | | | | | |
| 3 | Date of Appointment: | 8/27/2008 | NameoftheCommittee Member: | Mr. JAYANAND A | | | | | | | | |
| Profession: | CHAIR PERSON | Associated With: | Complaints | | | | | | | | |
| Mobile Number: | 9487018868 | Email Address: | jayanand_a@rediffmail.com | | | | | | | | |
| Designation | PROFESSOR | Gender | Female | | | | | | | | |
| Sr. No. | Committee Type: | COMPLAINT COMMITTEE | AppointmentOrder Reference Number: | Supdt/MCET/19/2021 | | | | | | | | |
| 4 | Date of Appointment: | 1/4/2021 | NameoftheCommittee Member: | REJULAL R P | | | | | | | | |
| Profession: | MEMBER | Associated With: | Complaints | | | | | | | | |
| Mobile Number: | 9190568956 | Email Address: | rejulalrp@gmail.com | | | | | | | | |
| Designation | NONTEACHING FACULTY | Gender | Male | | | | | | | | |
| Sr. No. | Committee Type: | COMPLAINT COMMITTEE | AppointmentOrder Reference Number: | Supdt/MCET/19/2021 | | | | | | | | |
| 5 | Date of Appointment: | 1/4/2021 | NameoftheCommittee Member: | Mr. JAYASEKHARAN S | | | | | | | | |
| Profession: | MEMBER | Associated With: | Complaints | | | | | | | | |
| Mobile Number: | 9487056895 | Email Address: | jayasekharan_st@gmail.com | | | | | | | | |
| Designation | NONTEACHING FACULTY | Gender | Male | | | | | | | | |
| Sr. No. | Committee Type: | COMPLAINT COMMITTEE | AppointmentOrder Reference Number: | Supdt/MCET/19/2023 | | | | | | | | |
| 6 | Date of Appointment: | 7/3/2023 | NameoftheCommittee Member: | SHERLY S | | | | | | | | |
| Profession: | MEMBER | Associated With: | Complaints | | | | | | | | |
| Mobile Number: | 9690458965 | Email Address: | judithstarlin@gmail.com | | | | | | | | |
| Designation | ASSOCIATE PROFESSOR | Gender | Female | | | | | | | | |
| Sr. No. | Committee Type: | COMPLAINT COMMITTEE | AppointmentOrder Reference Number: | Supdt/MCET/19/2023 | | | | | | | | |
| 7 | Date of Appointment: | 7/3/2023 | NameoftheCommittee Member: | ISWARYA | | | | | | | | |
| Profession: | STUDENT | Associated With: | Complaints | | | | | | | | |
| Mobile Number: | 9096585815 | Email Address: | enaiswarya@gmail.com | | | | | | | | |
| Designation | STUDENT | Gender | Male | | | | | | | | |
| Sr. No. | Committee Type: | COMPLAINT COMMITTEE | AppointmentOrder Reference Number: | Supdt/MCET/19/2021 | | | | | | | | |
| 8 | Date of Appointment: | 1/4/2021 | NameoftheCommittee Member: | Mr. VISHNU | | | | | | | | |
| Profession: | STUDENT | Associated With: | Complaints | | | | | | | | |
| Mobile Number: | 7459012369 | Email Address: | hudsonoliv8056@gmail.com | | | | | | | | |
| Designation | STUDENT | Gender | Male | | | | | | | | |
| Sr. No. | Committee Type: | INTERNAL COMMITTEE | AppointmentOrder Reference Number: | Supdt/MCET/21/2022 | | | | | | | | |
| 9 | Date of Appointment: | 8/1/2022 | NameoftheCommittee Member: | ADITYA B R | | | | | | | | |
| Profession: | STUDENT | Associated With: | Ic | | | | | | | | |
| Mobile Number: | 9445685956 | Email Address: | anishaani006@gmail.com | | | | | | | | |
| Designation | STUDENT | Gender | Female | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. No. | Committee Type: | SC/SC COMMITTEE | AppointmentOrder Reference Number: | MCET/A3/Supdt/2020 | | | | | | | | |
| 1 | Date of Appointment: | 1/4/2021 | Name of the Committee | Mr. C. EDWIN BABU | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | Member: | | | | | | | | | |
| Profession: | Superintendent | Associated With: | Scholarship | | | | | | | | |
| Mobile Number: | 9842646190 | Email Address: | ebabujj@gmail.com | | | | | | | | |
| Caste: | Other | Gender: | Male | | | | | | | | |
| Sr. No. | Committee Type: | SC/SC COMMITTEE | AppointmentOrder Reference Number: | MCET/A3/Supdt/2020 | | | | | | | | |
| 2 | Date of Appointment: | 1/4/2021 | NameoftheCommittee Member: | SELVA KUMAR S | | | | | | | | |
| Profession: | Office Staff | Associated With: | Scjholarship | | | | | | | | |
| Mobile Number: | 9443002769 | Email Address: | ssksr2008@gmail.com | | | | | | | | |
| Caste: | Other | Gender: | Male | | | | | | | | |
| Sr. No. | Committee Type: | SC/SC COMMITTEE | AppointmentOrder Reference Number: | MCET/A3/Supdt/40/2020 | | | | | | | | |
| 3 | Date of Appointment: | 1/4/2021 | NameoftheCommittee Member: | Mrs. Kumari Deebha | | | | | | | | |
| Profession: | Associate Professor | Associated With: | Scholarship | | | | | | | | |
| Mobile Number: | 9445529275 | Email Address: | aeam_deeba@gmail.com | | | | | | | | |
| Caste: | Other | Gender: | Female | | | | | | | | |
| Sr. No. | Committee Type: | SC/SC COMMITTEE | AppointmentOrder Reference Number: | MCET/A3/Sudt/41/2024 | | | | | | | | |
| 4 | Date of Appointment: | 7/3/2023 | NameoftheCommittee Member: | Mrs. ISWARYA | | | | | | | | |
| Profession: | STUDENT | Associated With: | Scholarship | | | | | | | | |
| Mobile Number: | 7373057782 | Email Address: | enggoiswarya@gmail.com | | | | | | | | |
| Caste: | Sc | Gender: | Female | | | | | | | | |
| Sr. No. | Committee Type: | SC/SC COMMITTEE | AppointmentOrder Reference Number: | MCET/A3/MCET/42/202 | | | | | | | | |
| 5 | Date of Appointment: | 7/3/2023 | NameoftheCommittee Member: | Mr. ASLISH PRASAD | | | | | | | | |
| Profession: | STUDENT | Associated With: | Scholarship | | | | | | | | |
| Mobile Number: | 8100568956 | Email Address: | aslish.prasathy@gmail.com | | | | | | | | |
| Caste: | St | Gender: | Male | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. No. | Committee Type: | COUNSELLOR COMMITTEE | AppointmentOrder Reference Number: | A3/MCET/49/2022 | | | | | | | | |
| 1 | Date of Appointment: | 8/1/2022 | NameoftheCommittee Member: | PRAKASH S | | | | | | | | |
| Profession: | AP | Associated With: | Counsil | | | | | | | | |
| Mobile Number: | 8300159875 | Email Address: | jayarocks15@gmail.com | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. No. | Committee Type: | INDUSTRY COMMITTEE | AppointmentOrder Reference Number: | A3/MCET/47/2021 | | | | | | | | |
| 1 | Date of Appointment: | 1/4/2021 | NameoftheCommittee Member: | BIJU A | | | | | | | | |
| Profession: | ASSISTANT PROFESSOR | Associated With: | Industry | | | | | | | | |
| Mobile Number: | 9487024595 | Email Address: | bijua_a@gmail.com | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Programme | ENGINEERINGAND TECHNOLOGY | Number of Tiles | 9310 | | | | | | | | |
| No. | | | | | | | | |
| 1 | Number of Volumes | 26356 | NumberofJournals published in India | 174 | | | | | | | | |
| Number of Journals | 115 | Number of eBook | 0 | | | | | | | | |
| published at Abroad | Volumes-UG | | | | | | | | |
| NumberofeBook Volumes-PG | 2202 | NumberofeBook Volumes-Diploma | 0 | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| NumberofeBook Titles-UG | 250 | NumberofeBook Titles-PG | 300 | | | | | | | | |
| Number of eBook | 0 | | | | | | | | |
| Titles-Diploma | | | | | | | | |
| Sr. | Programme | MANAGEMENT | Number of Tiles | 1690 | | | | | | | | |
| No. | | | | | | | | |
| 2 | Number of Volumes | 6550 | NumberofJournals published in India | 30 | | | | | | | | |
| Number of Journals | 34 | Number of eBook | 0 | | | | | | | | |
| published at Abroad | Volumes-UG | | | | | | | | |
| NumberofeBook Volumes-PG | 1100 | NumberofeBook Volumes-Diploma | 0 | | | | | | | | |
| Number of eBook | 0 | Number of eBook | 100 | | | | | | | | |
| Titles-UG | Titles-PG | | | | | | | | |
| NumberofeBook Titles-Diploma | 0 | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| Sr. | Workinghoursfrom to | 8.30 A.M to 6.00 p.m | Reprographic Facility | Yes | | | | | | | | |
| No. | | | | | | | | |
| 1 | CurrentAnnual Budget Rs. | 300000 | BarCodeorRFTab Book handling ? | Yes | | | | | | | | |
| Reading Room | 250 | Library Networking | YES | | | | | | | | |
| Seating Capacity | | | | | | | | |
| NameofEJournal Subscription | ICAF | LibraryManagement Software | Yes | | | | | | | | |
| Number of | 15 | Total Library Area in | 500 | | | | | | | | |
| Multimedia PCs | Sqm | | | | | | | | |
| | | | | | | | | | | | |
| OTHER FACILITIES I | | | | | | | |
| Particulars | Status | Particulars | Status | Particulars | Status | | | | | | | |
| PotableWater Supply | Yes | Backup Electric Supply | Yes | CCTV Security | Yes | | | | | | | |
| Barrier free Environment | Yes | Institution Web Site | Yes | Insurancefor Students | Yes | | | | | | | |
| General Insurance | Yes | AllWeatherApproach (Motorized Road) | Yes | FireandSafety Certificate | Yes | | | | | | | |
| Post &Banking/ATM | Yes | Projectors in Classrooms | Yes | Medical &Counselling | Yes | | | | | | | |
| Staff Quarters | Yes | Public Announcement System | Yes | GroupInsurance for Employees | Yes | | | | | | | |
| ElectricalGrid PowerSupply Connection | Yes | Telecom &FAX | Yes | Safety Provisions | Yes | | | | | | | |
| RainWater Harvesting | Yes | ERP Software | Yes | Transport Facility | Yes | | | | | | | |
| First Aid | Yes | Sewage Disposal System | Yes | Appointmentof Student Counselor | Yes | | | | | | | |
| Sports Facilities | Yes | Innovation Cell/Club | Yes | Participationin the National Innovation Ranking | Yes | | | | | | | |
| Establishmentof Committee For SC/ST | Yes | Vehicle Parking | Yes | Establishmentof Anti Ragging Committee | Yes | | | | | | | |
| Implementationof examination reforms | Yes | Auditorium | Yes | Implementationof teacher training policy | Yes | | | | | | | |
| | | | | | | | | | | | |
| Institution- IndustryCell | Yes | Media Cell | Yes | Atleast5MoUs with Industries | Yes | | | | | | | |
| Intellectual PropertyofRight Cell | Yes | ImplementationofStartup Policy | Yes | InternalQuality Assurance Cell | Yes | | | | | | | |
| Implementing FoodSafetyand Standard Act,2006in the Institution | Yes | Applied for | Yes | EnterMembership Number | AC1560655 | | | | | | | |
| MembershipofNationalDigital Library | | | | | | | |
| Participationin the | Yes | EstablishmentofOnline Grievance Rederssal Mechanism | Yes | GroupAccident Policy to be provided by Employees | Yes | | | | | | | |
| National Institutional Ranking | | | | | | | |
| Framework (NIRF) | | | | | | | |
| Provisiontowatch MOOCS Courses through | Yes | Implementation of | Yes | GeneralNotice Board and Departmental Notice Board | Yes | | | | | | | |
| Swayam | theschemesannouncedby Government of India | | | | | | | |
| Offering of Skill Development CoursesApproved by the Council | Yes | Implementationofmandatory internship policy for Students | Yes | Establishmentof Internal Committee (IC) | Yes | | | | | | | |
| Complianceofthe AcademicBankof Credit (ABC) | Yes | ImplementationofUnnatBharat Abhiyan/SaansadAdarshGram Yojana (SAGY) | Yes | Installation of GridConnected Solar Rooftops/Power Systems | Yes | | | | | | | |
| as per MoE directives, (Applicable for Standalone Institutions, PGDM/PGCMand Universities) | | | | | | | |
| Whether the Institution has implemented Safety and Securitymeasures in the Campus? | Yes | FabricationFacilityLaboratory (FABLAB) Tinkering Laboratory/ Innovation Laboratory | Yes | DigitalPayment forallFinancial Transactionsas per MHRD Directives | Yes | | | | | | | |
| Whether your Institution has introducedonline Aadhar linked Biometric attendance for regular faculty members? | Yes | EffortstoencourageFinalYear students to appear for GATE Examination | Yes | Efforts to encourage students to take- up internship and project work in IndianKnowledge System related Areas/Topics/Disa ster Management | Yes | | | | | | | |
| Implementationof StudentInduction Programme | Yes | Waste Management and environmentimprovement measures to ensure | Yes | Efforts to encourage students to participate in National/Internatio nal | Yes | | | | | | | |
| a sustainable Green Campus | competitionlike SIH, IDEATHON, | | | | | | | |
| etc | | | | | | | |
| GeneralInsurance provided for assets against fire, burglary and other calamities | Yes | Measures for Cybersecurity | Yes | PlasticFree Campus | Yes | | | | | | | |
| Establishment of platformorhiring counsellors for | Yes | Establishment of 24x7 Women helplinenumberandasecurity system | Yes | Enter Women HelplineNumber | 7373057776 | | | | | | | |
| | | | | | | | | | | | |
| seeking help and guidance w.r.t psychological counselling related to Mental Health for Students, faculty andnon-teaching faculty | | in the campus for providing safetytostudentsandfemale faculty and | | | | | | | | | | |
| non-teaching faculty | | | | | | | |
| Implementationof PARAKH | Yes | Internship(Compulsaryforall final year students) | Yes | As per NEP, have inbuiltmechanism for Social | Yes | | | | | | | |
| and Emotional LearningAcrucial component of Education. | | | | | | | |
| Green and eco- friendly campus whichfocuseson energy efficiency by preserving naturalresources for healthy living and a good learning environment | Yes | Haveamechanismforearning credits through 'Skilling' basedcoursesofferedbySkill India, Ministry of Skill Development | Yes | The electives mandatorily throughSWAYAM (MOOCS Platform) | Yes | | | | | | | |
| and Entrepreneurship OR any otherleadingskillingplatforms | | | | | | | |
| Language Laboratory (for institutionshaving Diploma and Degree Programs) | Yes | AvailabilityofatleastONE Smart Class Room per Department | Yes | Implementationof One Student One Laptop Scheme | Yes | | | | | | | |
| | | | | | | | | | | | |
| OTHER FACILITIES II | | | | | | | | | | |
| Sr. No. | Particulars | Status | | | | | | | | | | |
| 1 | CopiesofAICTEApprovals(LOAandEOAofsubsequentyears)obtainedsinceInceptionof Institution till date shall be placed in the Website of the Institution | Yes | | | | | | | | | | |
| 2 | DisplayBoardwithinthepremisesaswellasintheWebsiteoftheInstitutionIndicatingthe Feedback Facility of Students and Faculty Members Available in the AICTE Web Portal | Yes | | | | | | | | | | |
| 3 | EstablishmentofGrievanceRedressalCommitteeintheInstitutionandAppointmentof OMBUDSMAN by the University | Yes | | | | | | | | | | |
| DisplayofCourse(s)and"ApprovedIntake"intheInstitutionattheentranceofthe Institution. Course(s) taken through duly recognized MOOCs shall be used as Supplementary Course(s) | Yes | | | | | | | | | | |
| 4 | | | | | | | | | | |
| 5 | Availabilityofqualitysanitarynapkinsthroughsanitarynapkinvendingmachinesand ensuring safe and environment friendly disposal of used sanitary napkin | Yes | | | | | | | | | | |
| 6 | DisplayofinformationsubmittedtoAICTE(includingtheaccreditationstatusandBoardof Governors) along with mandatory disclosures in the Web site of the Institution | Yes | | | | | | | | | | |
| 7 | DisplayofCourse(s)and"ApprovedIntake"intheUniversityattheentranceofthe University | Yes | | | | | | | | | | |
| 8 | Equal Opportunity Facilitation Cell (EOFC) | Yes | | | | | | | | | | |
| | | | | | | | | | | | |
| OTHER FACILITIES III | | | | | | | | | | |
| Sr. No. | Particulars | Status | | | | | | | | | | |
| 1 | Whether mandatory disclosure is uploaded in Institution's website? | Yes | | | | | | | | | | |
| 2 | WhethertheInstitutionfollowingICAI(InstituteofCharteredAccountantsofIndia) Accounting Formats? | Yes | | | | | | | | | | |
| 3 | Feestobecharged,Reservationpolicy,AdmissionpolicyandDocumentretentionpolicyare duly approved by State Govt? | Yes | | | | | | | | | | |
| 4 | Feestobecharged,Reservationpolicy,AdmissionpolicyandDocumentretentionpolicyare duly approved by Affiliating University? | Yes | | | | | | | | | | |
| 5 | Feestobecharged,Reservationpolicy,AdmissionpolicyandDocumentretentionpolicyare uploaded in Institution's Website? | Yes | | | | | | | | | | |
| 6 | Courses/Approved Intake displayed at the entrance of the Institution? | Yes | | | | | | | | | | |
| 7 | Is the Cafeteria shared among other institution? | No | | | | | | | | | | |
| 8 | Is Library and Reading Room shared among other institution? | No | | | | | | | | | | |
| | | | | | | | | | | | |
| 9 | Is the Computer Centre shared among other institution? | No | | | | | | | | | | |
| 10 | Whether Institution is operating from Permanent Site/Temporary Site? | Permanent Site | | | | | | | | | | |
| 11 | Whether you are registered on NAD? | Yes | | | | | | | | | | |
| 12 | Whether all the students documents are uploaded or not? | Yes | | | | | | | | | | |
| 13 | Whether your University is having approval for EWS Quota from your State? | Yes | | | | | | | | | | |
| 14 | Implementation of Skill India Mission | Yes | | | | | | | | | | |
| 15 | Institute Innovation Council (IIC) | No | | | | | | | | | | |
| 16 | Whether your Institution is having NIRF ranking below 200? | No | | | | | | | | | | |
| 17 | Is your Institution selected for 'Study in India' Program by Govt. by India? | No | | | | | | | | | | |
| 18 | Provision / Facilities to conduct Online Meetings, Webinars, Classes and Examinations? | No | | | | | | | | | | |
| 19 | Facilitate teachers for undergoing Pedagogical training through NITTT Guidelines? | No | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| BANK DETAILS | | | | | | | | | |
| Bank Name: | HDFC | Bank IFSC Code: | HDFC0001878 | | | | | | | | | |
| | | MARIACOLLEGEOF ENGINEERING AND TECHNOLOGY | | | | | | | | | |
| Bank Account Number: | 18781450000017 | Account Holder Name: | | | | | | | | | |
| Branch Name: | THUCKALAY | Branch Code: | 1878 | | | | | | | | | |
| Address of the Bank: | THUCKALAY | State: | Tamil Nadu | | | | | | | | | |
| PIN: | 629175 | Telephone No. of the Bank: | 4651282319 | | | | | | | | | |
| Bank Account Type: | Saving Account | Bank Branch MICR Code: | 629240003 | | | | | | | | | |
| WhethertheAccountisin the | Yes | | | | | | | | | | | |
| Name of Beneficiary | WhethertheAccountis Operational: | Yes | | | | | | | | | |
| Institute: | | | | | | | | | | | |
| WhethertheAccountisa no-Frill Account: | No | WhethertheAccountisJoint Account: | No | | | | | | | | | |
| SecondAccountHolder Name: | Data Not Available | Mode of Operation: | Data Not Available | | | | | | | | | |
| Do You wish to change Bank Name? : | No | | | | | | | | | |
| | | | | | | | | | | | |
| TRUST BANK DETAILS | | | | | | | | | |
| Bank Name | Bank IFSC Code | Bank Account Number | Account Holder Name | | | | | | | | | |
| Catholic Syrian Bank | CSBK0000377 | 3.7703602250195E+16 | AVEMARIAEDUCATIONAL AND CHARITABLE TRUST | | | | | | | | | |
| | | | | | | | | | | | |
| INCOME & EXPENDITURE DETAILS | | | | | | | | | |
| INCOME | | | | | | | | | |
| Income from Central Govt: | 0 | IncomefromState Government: | 0 | | | | | | | | | |
| Income from Student Fees: | 59382600 | Income from Donations: | 0 | | | | | | | | | |
| Income from UGC: | 0 | Income from Other Bodies: | 0 | | | | | | | | | |
| Total Income: | 59382600 | | | | | | | | | |
| INCOME | | | | | | | | | |
| Income from Central Govt: | 0 | IncomefromState Government: | 0 | | | | | | | | | |
| Income from Student Fees: | 90726246 | Income from Donations: | 0 | | | | | | | | | |
| Income from UGC: | 0 | Income from Other Bodies: | 0 | | | | | | | | | |
| Total Income: | 90726246 | | | | | | | | | |
| INCOME | | | | | | | | | |
| Income from Central Govt: | 0 | IncomefromState Government: | 0 | | | | | | | | | |
| Income from Student Fees: | 114555762 | Income from Donations: | 0 | | | | | | | | | |
| Income from UGC: | 0 | Income from Other Bodies: | 0 | | | | | | | | | |
| Total Income: | 114555762 | | | | | | | | | |
| | | | | | | | | | | | |
| INCOME | | | | | | | | | |
| Income from Central Govt: | 0 | IncomefromState Government: | 0 | | | | | | | | | |
| Income from Student Fees: | 90726246 | Income from Donations: | 0 | | | | | | | | | |
| Income from UGC: | 0 | Income from Other Bodies: | 0 | | | | | | | | | |
| Total Income: | 90726246 | | | | | | | | | |
| EXPENDITURE | | | | | | | | | |
| Salary Teaching Staff: | 49592680 | Salary Non-Teaching Staff: | 7854850 | | | | | | | | | |
| Library: | 58304 | Equipment: | 197990 | | | | | | | | | |
| Building Maintenance: | 62130 | Other Expenditure: | 1016230 | | | | | | | | | |
| Total Expenditure: | 58782184 | | | | | | | | | |
| EXPENDITURE | | | | | | | | | |
| Salary Teaching Staff: | 59875296 | Salary Non-Teaching Staff: | 5414400 | | | | | | | | | |
| Library: | 616362 | Equipment: | 7274025 | | | | | | | | | |
| Building Maintenance: | 2896438 | Other Expenditure: | 4876566 | | | | | | | | | |
| Total Expenditure: | 80953087 | | | | | | | | | |
| EXPENDITURE | | | | | | | | | |
| Salary Teaching Staff: | 96776352 | Salary Non-Teaching Staff: | 1484691 | | | | | | | | | |
| Library: | 675162 | Equipment: | 7980317 | | | | | | | | | |
| Building Maintenance: | 3172101 | Other Expenditure: | 5261235 | | | | | | | | | |
| Total Expenditure: | 115349858 | | | | | | | | | |
| EXPENDITURE | | | | | | | | | |
| Salary Teaching Staff: | 59875296 | Salary Non-Teaching Staff: | 5414400 | | | | | | | | | |
| Library: | 616362 | Equipment: | 7274025 | | | | | | | | | |
| Building Maintenance: | 2896438 | Other Expenditure: | 4876566 | | | | | | | | | |
| Total Expenditure: | 80953087 | | | | | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |
| TIT | FIRST | SEC | DES | COURSE | DOJ | UG | PG | | | | | |
| Dr. | RAJAM | REJU LAL | PROFESSOR | AUTO | 1/4/2021 | Y | N | | | | | |
| Mr. | VALSALAM ROSE | RAJESH KUMAR | Associate | AUTO | 7/15/2010 | Y | N | | | | | |
| Mr. | PAUL | RAJ | Assistant Prof | AUTO | 7/1/2019 | Y | N | | | | | |
| Mr. | SUJITH | THANKAPPAN | Assistant Prof | AUTO | 9/2/2024 | Y | N | | | | | |
| Mr. | AKASH KURIEN | JOHN | Assistant Prof | AUTO | 1/2/2023 | Y | N | | | | | |
| Mr. | KANNAN | R | Assistant Prof | AUTO | 1/2/2023 | Y | N | | | | | |
| Mr. | MANOJ KUMAR | M | Associate | AUTO | 01.09.2025 | Y | N | | | | | |
| Mrs. | ASISH | SHIJO | Associate | C. SYSTEM | 7/15/2010 | N | Y | | | | | |
| Mrs. | JOHN ROSE | DELPHIN ROSE | Assistant Prof | C. SYSTEM | 7/1/2015 | N | Y | | | | | |
| Mrs. | DEVARAJ | SREEJA | Assistant Prof | C. SYSTEM | 7/1/2017 | N | Y | | | | | |
| Dr. | JERISHA LIBY | J | PROFESSOR | C. SYSTEM | 7/1/2014 | N | Y | | | | | |
| Mrs. | GEORGE SIMON | SONIA SIMON | Associate | CIVIL | 7/1/2015 | N | Y | | | | | |
| Mr. | THANKAIAN | BRIGHT SINGH ARUL RAJ | Associate | CIVIL | 7/1/2019 | Y | N | | | | | |
| Mr. | SHAJU | JOSSIAH | Associate | CIVIL | 8/8/2011 | Y | N | | | | | |
| Miss | MERSHEELA | GNANADHAS | Assistant Prof | CIVIL | 4/1/2016 | Y | N | | | | | |
| Miss | DEVA RAJ | SUDHARSINI | Assistant Prof | CIVIL | 12/3/2018 | Y | N | | | | | |
| Mrs. | RAJAN | NITHIYA | Assistant Prof | CIVIL | 7/1/2019 | Y | N | | | | | |
| Mr. | FEHLBERG | JAWAHAR RETNA KUMAR | Assistant Prof | CIVIL | 5/2/2022 | Y | N | | | | | |
| Mr. | JINSON | M | Assistant Prof | CIVIL | 11/1/2024 | Y | N | | | | | |
| Mrs. | ANUSUIYA | T R | Assistant Prof | CIVIL | 1/4/2021 | Y | N | | | | | |
| Dr. | HARIHARA | IYER | PROFESSOR | CIVIL | 6/27/2008 | Y | N | | | | | |
| Mrs. | Mr.JASNOE | DANIEL E | Assistant Prof | CONSTRUCTION | 31.01.2025 | N | Y | | | | | |
| Ms. | Mr. CLINT C J | | Assistant Prof | CONSTRUCTION | 31.01.2025 | N | Y | | | | | |
| Dr. AUSTIN J | | Professor | CONSTRUCTION | 01.08.2025 | | Y | | | | | |
| Mr. | BENILA | R | Associate | CSE - PG | 01.09.2025 | N | Y | | | | | |
| Mr. | SUBIN DHAS | D | Assistant Prof | CSE - PG | 7/1/2017 | N | Y | | | | | |
| Mrs. | ABISHA | C | Assistant Prof | CSE - PG | 01.09.2025 | N | Y | | | | | |
| Dr. | ANANDA | JAYANAND | PROFESSOR | CSE - PG | 6/27/2008 | N | Y | | | | | |
| Mr. | VIJIN | R | Associate | CSE - UG | 12/1/2015 | Y | N | | | | | |
| Mr. | SHIBU DAS | D | Associate | CSE - UG | 01.09.2025 | Y | N | | | | | |
| Mr. | ANSON | JEENPRABHU | Associate | CSE - UG | 7/21/2010 | Y | N | | | | | |
| Mrs. | JASMINE VIJI | J | Assistant Prof | CSE - UG | 1/2/2024 | Y | N | | | | | |
| Mrs. | LINTA | X | Assistant Prof | CSE - UG | 7/1/2019 | Y | N | | | | | |
| Mrs. | SUKANYA | V | Assistant Prof | CSE - UG | 9/2/2024 | Y | N | | | | | |
| Mr. | MADHAN | P T | Assistant Prof | CSE - UG | 11/1/2024 | Y | N | | | | | |
| Mr. | JAMES | D | Assistant Prof | CSE - UG | 11/1/2024 | Y | N | | | | | |
| Mr. | BRAJITH KUMAR | G | Assistant Prof | CSE - UG | 3/1/2022 | Y | N | | | | | |
| Dr. | . | ABDUL KHADER | PROFESSOR | CSE - UG | 7/1/2017 | Y | N | | | | | |
| Mrs. | NISHAMILI | M | Assistant Prof | CSE AIDS UG | 12/2/2024 | Y | N | | | | | |
| Mrs. | EZHIL SWANLY | VINCENT | Assistant Prof | CSE AIDS UG | 1/2/2023 | Y | N | | | | | |
| Mr. | ROBIN CHANDRA | SAM GNANA CHANDRA | Assistant Prof | CSE AIML - PG | 7/3/2023 | N | Y | | | | | |
| JOSE | G | Assistant Prof | CSE AIML - PG | 31.01.2025 | | Y | | | | | |
| Dr. | GREENIE GEEVLIN | A L | PROFESSOR | CSE AIML - PG | 01.09.2025 | | Y | | | | | |
| Mr. | DARWIN CHARLES | JEYAN PRINCE CHARLES | Associate | ECE | 6/27/2008 | Y | N | | | | | |
| Mr. | ARULRAJ | SHIBIN | Associate | ECE | 7/1/2011 | Y | N | | | | | |
| Mrs. | ABISHA | R S | Assistant Prof | ECE | 8/6/2024 | Y | N | | | | | |
| Mr. | ALEX J | CHANDRA | Assistant Prof | ECE | 1/2/2024 | Y | N | | | | | |
| Mrs. | SUJATHA | SHARMY ROY | PROFESSOR | ECE | 7/1/2014 | Y | N | | | | | |
| Mrs. | JASPHIN | MELBA | Associate | EEE | 6/1/2011 | N | Y | | | | | |
| Mrs. | PRABHA | RASALAM | Assistant Prof | EEE | 1/2/2019 | Y | N | | | | | |
| Mr. | Mr. DEVA KIRUPA | JOYLIN.D | Assistant Prof | EEE | | Y | | | | | | |
| Miss | WILSON | NEENU | Assistant Prof | EEE | 1/2/2024 | Y | N | | | | | |
| Mr. | BABURAJ | R | Assistant Prof | EEE | 7/1/2013 | Y | N | | | | | |
| Dr. | KANAKARAJAN | ANTONY RAJU MANUEL | PROFESSOR | EEE | 6/27/2008 | Y | N | | | | | |
| Mr. | KANAKARAJ | JAWAHAR RAJ | Associate | EST | 1/2/2018 | N | Y | | | | | |
| Mrs. | GINOSHA | S | Assistant Prof | EST | 1/2/2018 | N | Y | | | | | |
| Mr. | REJIN | M A | Assistant Prof | EST | 8/1/2012 | N | Y | | | | | |
| Mrs. | ASWATHY | K A | PROFESSOR | EST | 8/6/2024 | N | Y | | | | | |
| Dr. | SADASIVAN | SHERIN SUBITHA | Associate | FIRST YEAR | 8/2/2010 | Y | N | | | | | |
| Mr. | DHIVYA | SASIKALA | Associate | FIRST YEAR | 6/27/2008 | Y | N | | | | | |
| Mrs. | KOCHAN NADAR | AMUTHA GLADIS | Associate | FIRST YEAR | 7/1/2017 | Y | N | | | | | |
| Mrs. | PUSHKARANNAIR | DEVIKA | Associate | FIRST YEAR | 7/15/2010 | Y | N | | | | | |
| Mrs. | CAROLINE | M | Associate | FIRST YEAR | 1/2/2018 | Y | N | | | | | |
| Miss | ANISHA | KANAKARAJ | Assistant Prof | FIRST YEAR | 3/3/2021 | Y | N | | | | | |
| Mrs. | ANISHA | GEORGE | Assistant Prof | FIRST YEAR | 11/24/2021 | Y | N | | | | | |
| Miss | SASIKUMAR | SHERLY | Assistant Prof | FIRST YEAR | 12/6/2021 | Y | N | | | | | |
| Miss | SIMSON | SIMONA | Assistant Prof | FIRST YEAR | 9/2/2024 | Y | N | | | | | |
| Mrs. | SOWMIYA | F | Assistant Prof | FIRST YEAR | 6/1/2018 | Y | N | | | | | |
| Mrs. | AKILA | S S | Assistant Prof | FIRST YEAR | 6/1/2018 | Y | N | | | | | |
| Mrs. | DHANUSHA | V S | Assistant Prof | FIRST YEAR | 8/6/2024 | Y | N | | | | | |
| Mrs. | BINUJA | S | Assistant Prof | FIRST YEAR | 2/1/2018 | Y | N | | | | | |
| Mrs. | PRATHEEBA | T V | Assistant Prof | FIRST YEAR | 3/1/2018 | Y | N | | | | | |
| Mr. | PREMSANTH | G | Assistant Prof | FIRST YEAR | 2/1/2018 | Y | N | | | | | |
| Dr. | SREEHAS | S | PROFESSOR | FIRST YEAR | 09.06.2025 | Y | | | | | | |
| Dr. | CHIRSTEENA | T | Associate | FIRST YEAR | 09.06.2025 | Y | | | | | | |
| Dr. | KALARANI | T | Associate | FIRST YEAR | 09.06.2025 | Y | | | | | | |
| Dr. | PAUL DHAS | STARLIN JUDITH VENIBHA | PROFESSOR | FIRST YEAR | 7/3/2017 | Y | N | | | | | |
| Dr. | FREDSELIN | VITHEL | PROFESSOR | FIRST YEAR | 6/27/2008 | Y | N | | | | | |
| Mrs. | PREM KUMAR | JAYA SUDHA | PROFESSOR | FIRST YEAR | 7/1/2017 | Y | N | | | | | |
| Dr. | KUMARI | DHEEBHA | PROFESSOR | FIRST YEAR | 6/27/2008 | Y | N | | | | | |
| Dr. | VIGNESWARI | G S | PROFESSOR | FIRST YEAR | 11/1/2024 | Y | N | | | | | |
| Mrs. | JEBA ANI | R | Assistant Prof | FIRST YEAR | 1/3/2022 | Y | N | | | | | |
| Mr. | STEBIJA MONI RASSEL | M S | Assistant Prof | FIRST YEAR | 7/1/2019 | Y | N | | | | | |
| Mr. | VERGIN VINO | G | Assistant Prof | FIRST YEAR | 9/2/2024 | Y | N | | | | | |
| Mr. | VIBIN | T | Assistant Prof | FIRST YEAR | 7/3/2023 | Y | N | | | | | |
| Mrs. | ADLIN MANUHA | M | Assistant Prof | FIRST YEAR | 03.12.2018 | Y | | | | | | |
| ARAVAIND | R R | Assistant Prof | FIRST YEAR | 09.06.2025 | Y | | | | | | |
| PRIYA | R K | Assistant Prof | FIRST YEAR | 09.06.2025 | Y | | | | | | |
| RADHIKA | R | Assistant Prof | FIRST YEAR | 09.06.2025 | Y | | | | | | |
| JAIN PREM ANAND | S | Assistant Prof | FIRST YEAR | 09.06.2025 | Y | | | | | | |
| SIVA KUMAR | S | Assistant Prof | FIRST YEAR | 09.06.2025 | Y | | | | | | |
| Mr. | ROBY | SABUKUMAR | Associate | MBA | 7/1/2009 | N | Y | | | | | |
| Mrs. | YANOCK | YANOCK | Associate | MBA | 6/27/2022 | N | Y | | | | | |
| Mrs. | JOHN ROSE | ASHA MOL | Associate | MBA | 8/18/2010 | N | Y | | | | | |
| Mr. | FEBIX RAJ | MEJILSUBHA | Assistant Prof | MBA | 6/1/2022 | N | Y | | | | | |
| Mr. | LAVANYA | P | Assistant Prof | MBA | 09.06.2025 | N | Y | | | | | |
| Mr. | MADHUKUMAR | BRITTO | Assistant Prof | MBA | 6/1/2022 | N | Y | | | | | |
| Mr. | LAWRENCE | SAJIN | Assistant Prof | MBA | 6/1/2022 | N | Y | | | | | |
| Mr. | AJIN | PUSPHA LEELA | Assistant Prof | MBA | 6/27/2022 | N | Y | | | | | |
| Mr. | JOTHISH | M N | Assistant Prof | MBA | 1/3/2022 | N | Y | | | | | |
| Mrs. | ABISHA | C | Assistant Prof | MBA | 1/2/2024 | N | Y | | | | | |
| Mrs. | PRIYANKA | M | Assistant Prof | MBA | 1/2/2024 | N | Y | | | | | |
| Mrs. | ANNIE VARSHA | J S | Assistant Prof | MBA | 9/2/2024 | N | Y | | | | | |
| Mr. | ASHIK BENZIHER | M S | Assistant Prof | MBA | 11/1/2024 | N | Y | | | | | |
| Mr. | SARATH KRISHNAN | A S | Assistant Prof | MBA | 11/1/2024 | N | Y | | | | | |
| Mr. | VINOD KUMAR | K V | Assistant Prof | MBA | 11/1/2024 | N | Y | | | | | |
| Mr. | SUBIN KUMAR | S | Assistant Prof | MBA | 11/1/2024 | N | Y | | | | | |
| Mrs. | JENCY RAVIDHAS | R L | Assistant Prof | MBA | 11/1/2024 | Y | Y | | | | | |
| Dr. | SASIKUMAR | SUDHA | PROFESSOR | MBA | 9/1/2017 | N | Y | | | | | |
| Dr. | SATHYA NESAN | STARLIN MANO | PROFESSOR | MBA | 7/1/2009 | N | Y | | | | | |
| Mr. | DOMINIC | DANIEL | Assistant Prof | MBA | 09.06.2025 | | | | | | | |
| Mr. | Mrs. BLESSING REENA B L | | PROFESSOR | MCA | 01.05.2023 | | | | | | | |
| Mrs. | Mrs. GNANA BEULA G | | Associate | MCA | 24.02.2025 | | | | | | | |
| Mr. | Mrs. JINISHA S V | | Assistant Prof | MCA | 09.06.2025 | | | | | | | |
| Mrs. | Mrs. PAUL CHRISTAL P | | Assistant Prof | MCA | 09.06.2025 | | | | | | | |
| Mrs. | Mr. GODWIN RAJ | | Assistant Prof | MCA | 01.05.2023 | | | | | | | |
| Mrs. | Mrs. VIMAL PREMI J P | | Assistant Prof | MCA | 01.09.2025 | | | | | | | |
| Mr. | PONNAPPAN | ANISH | Associate | MECH | 7/1/2017 | Y | N | | | | | |
| Dr. | YESUDHAS | SUJAR | PRINCIPAL | MECH | 12/27/2010 | Y | N | | | | | |
| Mr. JABA SINGH DAVID.D | | PROFESSOR | MECH | 9/1/2025 | | | | | | | |
| Mr. | GEORGEVINCENT | HAMJITAMERLIN | Associate | MECH | 2/4/2020 | Y | N | | | | | |
| Mr. | SHIBU SENTHIL | LAL | Associate | MECH | 6/4/2010 | Y | N | | | | | |
| Mr. | SAJILFENCY | PUSHPABAI | Associate | MECH | 9/2/2015 | Y | N | | | | | |
| Mr. | SEBASTIN NESA RAJ | RAJAYYAN | Assistant Prof | MECH | 7/4/2016 | Y | N | | | | | |
| Mr. | JENIFER | THOMPSON | Assistant Prof | MECH | 1/2/2018 | Y | N | | | | | |
| Mr. | THARMALINGAM | BENIN | Assistant Prof | MECH | 2/1/2020 | Y | N | | | | | |
| Mrs. | GINO | VIMALA | Assistant Prof | MECH | 9/2/2015 | Y | N | | | | | |
| Mr. | VIJAYAN | PRINCE | Assistant Prof | MECH | 8/2/2021 | Y | N | | | | | |
| Mr. | VIJIN | C | Assistant Prof | MECH | 9/2/2015 | Y | N | | | | | |
| Mr. | JENIBAR | I | Assistant Prof | MECH | 7/3/2023 | Y | N | | | | | |
| Mr. | SAJU | P | Assistant Prof | MECH | 12/3/2018 | Y | N | | | | | |
| Mr. | RAJA | S | Assistant Prof | MECH | 1/3/2022 | Y | N | | | | | |
| Mr. | JERIN | J K | Assistant Prof | MECH | 9/2/2024 | Y | N | | | | | |
| Mr. LEVANLAL SINGH. | N T | Assistant Prof | MECH | 01.09.2025 | | | | | | | |
| Mr. BRANESH NAYAGAM. | S | Assistant Prof | MECH | 01.09.2025 | | | | | | | |
| Mr. SAJU KUMAR N R | | Assistant Prof | MECH | 01.09.2025 | | | | | | | |
| Mrs. | PERSIAL | A | Assistant Prof | PED | 1/2/2019 | N | Y | | | | | |
| Mrs. | BABY PRIYANKA | B | Assistant Prof | PED | 8/6/2024 | N | Y | | | | | |
| Dr. | SHIBU JOSEPH VALSALAM | BRIGHT | PROFESSOR | PED | 2/12/2016 | N | Y | | | | | |
| BEGIN PRADHAS | R | Assistant Prof | PED | 01.07.2017 | | | | | | | |
| Dr. | DANIEL RAJ | T | PROFESSOR | PSE | 02.01.2025 | N | Y | | | | | |
| Mr. | SUNIL KUMAR | P G | Assistant Prof | PSE | 2/1/2020 | N | Y | | | | | |
| Dr. | PRAISELIN | W J | PROFESSOR | PSE | 9/2/2024 | N | Y | | | | | |
| JEBISHA J A | | Assistant Prof | PSE | 9/1/2025 | | | | | | | |
| Mrs. | RASHMI | P | Associate | STRUCTURAL | 1/2/2023 | N | Y | | | | | |
| Mr. | GNANADHAS | EBENEZER | Assistant Prof | STRUCTURAL | 1/3/2022 | Y | N | | | | | |
| Mrs. | BIBITHRA MOL | D V | Assistant Prof | STRUCTURAL | 1/2/2024 | N | Y | | | | | |
| Mrs. | BAHULAYAN NAIR | NIMMI KRISHNA | PROFESSOR | STRUCTURAL | 12/3/2018 | N | Y | | | | | |
| Mr. | NESAMONY | JEBIN | Associate | THERMAL | 4/4/2016 | Y | Y | | | | | |
| Mr. | ARUNSINGH | SWARNAMMA | Assistant Prof | THERMAL | 2/1/2020 | Y | N | | | | | |
| Mr. | ASWIN | KANAGA RAJ | Assistant Prof | THERMAL | 1/3/2022 | N | Y | | | | | |
| Dr. | PALAIYAN | TITTUS | PROFESSOR | THERMAL | 10/1/2008 | N | Y | | | | | |
| | | | | | | | | | | | |
| | | | | | | | | | | | |